Snowden Archive
——
The SIDtoday
Files
Browse the Archive

Letters To The Editor: Mission Assurance Facility Phase 2 Completed

SUMMARY

The author of the article writes to correct it, saying that the article did not reflect the information he provided.

DOCUMENT’S DATE

Aug 03, 2004

PUBLICLY AVAILABLE

Feb 05, 2018

1/1
Download
Page 1 from Letters To The Editor: Mission Assurance Facility Phase 2 Completed
DYNAMIC PAGE -- HIGHEST POSSIBLE CLASSIFICATION IS TOP SECRET // SI / TK // REL TO USA AUS CAN GBR NZL (S//REL) Letters To The Editor : Mission Assurance Facility Phase 2 Completed FROM: SIGINT Communications Unknown Run Date: 08/03/2004 (S//REL) The following was received about the article: Mission Assurance Facility Phase 2 Completed (S//REL) The article dated 29 July 2004 entitled "Mission Assurance Facility Phase 2 Completed" needs a bit of clarification. That article was based upon an email I wrote to General Quirk, but was modified. (S//REL) Unless you read the modified version carefully, a reader could come away with the impression that Phase 2 is completed. In point of fact, the Phase 2 "facility" is completed, however Phase 2 in totality is not. None of the Phase 2 mission has yet been populated (although as stated some boxes have started to arrive). (U) I really do appreciate the visibility that SIDtoday brings to the mission and to the people who worked so hard to make this project a success. However, I do believe a correction is in order to avoid misunderstandings on the part of your readers. Thanks, (U) Point taken. ed. No Further text "(U//FOUO) SIDtoday articles may not be republished or reposted outside NSANet without the consent of S0121 (DL sid_comms)." DYNAMIC PAGE -- HIGHEST POSSIBLE CLASSIFICATION IS TOP SECRET // SI / TK // REL TO USA AUS CAN GBR NZL DERIVED FROM: NSA/CSSM 1-52, DATED 08 JAN 2007 DECLASSIFY ON: 20320108