Internal TigerSwan Situation Report 2017-01-18
June 21, 2017
DAPL SITREP 128
January 18, 2017
John Porter
Chief Security Officer
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE.
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS.
DAPL SITREP 128
January 18, 2017
John Porter
Chief Security Officer
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE.
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS.
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
The Highlights
The activists in ND were at it again on North Bridge last night. They cut wire and destroyed
the barricade again while mostly respecting the limit of advance (a few crossed the barricade
but did not advance past the bridge head). LE/NG refrained from engaging the protesters,
but were positioned to hold the line in case the protesters began to break through the
barricade in large numbers. Protesters elsewhere continue to gripe about getting the Obama
administration to force USACE to start the EIS before leaving office and continued
coordination on social media with other pipeline protests throughout the US.
The Details
1. NORTH DAKOTA
i.
ii.
TigerSwan
Intel Update
a. Pattern analysis confirmed use of misdirection strategies by protestors. They are
using direct action at North Bridge as a distraction from fast moving elements
along the southern and eastern approaches to HDD-W. OP3 predicted this
movement and remained vigilant.
b. Protestors seem concerned with LE/NG staging and movement as they predict
the clearing of Camp 2 will occur in the very near future.
c. Leadership within Camp 2 is fractured with a split between direct action
agitators and peaceful occupiers.
Past 24 Hours
a. Protesters escorted a native elder to North Bridge from Camp 2 and later to the
stump located southwest of OP3.
b. Approximately 50 protesters conducted several large direct actions targeting
different areas around HDD-W. On North Bridge, they removed wire and
damaged the barricade in the afternoon and then again in the late evening after
LE had made repairs. The protesters outnumbered LE in the late evening feud
even though LE had issued a 100 mile Code Red and had begun calling in day
shift officers. Two individuals were arrested during the afternoon altercation,
but none in the evening.
c. LE gave significant ground during both actions, allowing protestors to infiltrate
across the barricade. LE did not follow through on orders to the protesters to
move away from LE lines or be arrested. The protestors celebrated a victory after
NG/LE pulled back from the bridge and allowed the destruction of the barricade.
This most likely led to a boost in protester confidence and led to the second
direct action and sabotage of North bridge defenses after midnight. The second
action was significantly more organized and the protestors were bolder in their
actions.
Prepared for Energy Transfer Partners
1
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
The Highlights
The activists in ND were at it again on North Bridge last night. They cut wire and destroyed
the barricade again while mostly respecting the limit of advance (a few crossed the barricade
but did not advance past the bridge head). LE/NG refrained from engaging the protesters,
but were positioned to hold the line in case the protesters began to break through the
barricade in large numbers. Protesters elsewhere continue to gripe about getting the Obama
administration to force USACE to start the EIS before leaving office and continued
coordination on social media with other pipeline protests throughout the US.
The Details
1. NORTH DAKOTA
i.
ii.
TigerSwan
Intel Update
a. Pattern analysis confirmed use of misdirection strategies by protestors. They are
using direct action at North Bridge as a distraction from fast moving elements
along the southern and eastern approaches to HDD-W. OP3 predicted this
movement and remained vigilant.
b. Protestors seem concerned with LE/NG staging and movement as they predict
the clearing of Camp 2 will occur in the very near future.
c. Leadership within Camp 2 is fractured with a split between direct action
agitators and peaceful occupiers.
Past 24 Hours
a. Protesters escorted a native elder to North Bridge from Camp 2 and later to the
stump located southwest of OP3.
b. Approximately 50 protesters conducted several large direct actions targeting
different areas around HDD-W. On North Bridge, they removed wire and
damaged the barricade in the afternoon and then again in the late evening after
LE had made repairs. The protesters outnumbered LE in the late evening feud
even though LE had issued a 100 mile Code Red and had begun calling in day
shift officers. Two individuals were arrested during the afternoon altercation,
but none in the evening.
c. LE gave significant ground during both actions, allowing protestors to infiltrate
across the barricade. LE did not follow through on orders to the protesters to
move away from LE lines or be arrested. The protestors celebrated a victory after
NG/LE pulled back from the bridge and allowed the destruction of the barricade.
This most likely led to a boost in protester confidence and led to the second
direct action and sabotage of North bridge defenses after midnight. The second
action was significantly more organized and the protestors were bolder in their
actions.
Prepared for Energy Transfer Partners
1
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
iii.
d. HDD-W updates: AP2 rewired, elevated perimeter security posture to Amber due
to action on North Bridge.
e. HDD-E updates: discussed trigger line assessments for measured response,
relayed information to crews about evacuation procedures in the event of a
direct threat.
Next 24 Hours
a. Conduct damage assessment on perimeter and reestablish physical security
measures lost due to continued protester actions at North Bridge and Turtle Hill.
b. Continue security efforts at HDD-W, HDD-E, valve sites and Mandan Municipal
Airport.
2. IOWA
i.
ii.
iii.
Intel Update
a. Protesters made a FB event urging people to call members of the Obama
Administration over the next several days to request another EIS to prevent
further work and help their pending IUB lawsuit:
https://www.facebook.com/events/1843690565913634/?acontext=%7B%22ref
%22%3A%2222%22%2C%22feed story type%22%3A%2222%22%2C%22action
history%22%3A%22null%22%7D
Past 24 Hours
a. Continued static security at the Cambridge Pump Station.
b. Conducted threat assessment of the Cambridge Pump Station.
Next 24 Hours
a. Continue to perform static security the Cambridge Pump Station.
b. Conduct valve site verification and completion inspections.
3. ILLINOIS
i.
ii.
iii.
Intel Update
a. The fencing around the Patoka Pipe yard is nearly complete. The pipe yard has
likely been the most surveilled location on the IL ROW and has been mentioned
by Diamond Pipeline and Memphis protesters as a potential target.
b. Chicago activists continue their focus on the call-in protests slated for 18 and
20JAN while coordinating on social media with various other pipeline protests
across the country.
Past 24 Hours
a. Continued security posture review..
Next 24 Hours
a. Continue evaluation of valve sites (210-300).
4. SOUTH DAKOTA
i.
TigerSwan
Intel Update
Prepared for Energy Transfer Partners
2
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
iii.
d. HDD-W updates: AP2 rewired, elevated perimeter security posture to Amber due
to action on North Bridge.
e. HDD-E updates: discussed trigger line assessments for measured response,
relayed information to crews about evacuation procedures in the event of a
direct threat.
Next 24 Hours
a. Conduct damage assessment on perimeter and reestablish physical security
measures lost due to continued protester actions at North Bridge and Turtle Hill.
b. Continue security efforts at HDD-W, HDD-E, valve sites and Mandan Municipal
Airport.
2. IOWA
i.
ii.
iii.
Intel Update
a. Protesters made a FB event urging people to call members of the Obama
Administration over the next several days to request another EIS to prevent
further work and help their pending IUB lawsuit:
https://www.facebook.com/events/1843690565913634/?acontext=%7B%22ref
%22%3A%2222%22%2C%22feed story type%22%3A%2222%22%2C%22action
history%22%3A%22null%22%7D
Past 24 Hours
a. Continued static security at the Cambridge Pump Station.
b. Conducted threat assessment of the Cambridge Pump Station.
Next 24 Hours
a. Continue to perform static security the Cambridge Pump Station.
b. Conduct valve site verification and completion inspections.
3. ILLINOIS
i.
ii.
iii.
Intel Update
a. The fencing around the Patoka Pipe yard is nearly complete. The pipe yard has
likely been the most surveilled location on the IL ROW and has been mentioned
by Diamond Pipeline and Memphis protesters as a potential target.
b. Chicago activists continue their focus on the call-in protests slated for 18 and
20JAN while coordinating on social media with various other pipeline protests
across the country.
Past 24 Hours
a. Continued security posture review..
Next 24 Hours
a. Continue evaluation of valve sites (210-300).
4. SOUTH DAKOTA
i.
TigerSwan
Intel Update
Prepared for Energy Transfer Partners
2
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
ii.
iii.
TigerSwan
a. No significant intelligence to report.
Past 24 Hours
a. Personnel in static positions maintained Redfield Pump Station security, while
remaining personnel acted as QRF.
Next 24 Hours
a. Security will continue static guard at the Redfield Pump Station.
b. Current PM will begin handoff of duties to incoming PM.
Prepared for Energy Transfer Partners
3
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
ii.
iii.
TigerSwan
a. No significant intelligence to report.
Past 24 Hours
a. Personnel in static positions maintained Redfield Pump Station security, while
remaining personnel acted as QRF.
Next 24 Hours
a. Security will continue static guard at the Redfield Pump Station.
b. Current PM will begin handoff of duties to incoming PM.
Prepared for Energy Transfer Partners