Documents
Internal TigerSwan Situation Report 2017-04-09
Aug. 26, 2017
DAPL SITREP 207
April 9, 2017
John Porter
Chief Security Officer
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE.
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS.
DAPL SITREP 207
April 9, 2017
John Porter
Chief Security Officer
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE.
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS.
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
The Highlights
Protesters have been discussing re-occupying U.S. Army Corp of Engineer property near the
Cannon Ball Ranch. The Cheyenne River camp is much more organized than previous camps.
Previous damage to the valves in South Dakota and Iowa are leading to new information with
possible leads coming from the Native Roots Group. We have sources in the camp working to
confirm this information.
The Details
1. NORTH DAKOTA
i.
ii.
TigerSwan
Intel Update
a. At approximately 1210 hrs. Morton County Sheriff’s Department found the body
of a deceased white Caucasian male on the shore line near the mouth of the
Cannon Ball River on U.S. Army Corp of Engineer land. This site is located just
south of the former OP3 on DAPL property. The male subject was identified as a
citizen of the Republic of Macedonia. Morton County was initially notified about
the body by three fishermen who were fishing in the area. The body appears to
have been in the water for quite some time.
a) Analyst Comment: This situation is still developing and will be updated as
more information is gathered. At this time, it is unknown if the deceased
was affiliated with the protests at Standing Rock.
b. Source Reporting - Protesters at the Cheyenne River Camp seem to be planning
for a large gathering of protesters in the near future. The camp will be used as a
staging area. Initial estimates state that 300 to 400 protesters may be returning to
the area in the coming weeks. Protesters have been discussing re-occupying U.S.
Army Corp of Engineer property near the Cannon Ball Ranch.
b) Analyst Comment: This situation will be closely monitored for any new
influx of protesters or new camps.
c. Source Reporting - Cheyenne River Camp near Cannonball, ND is welcoming to
newcomers. They are putting guests/camp workers up in the military tents,
which are all heated. The camp does not allow any live streaming or other social
media activity. The teepees are being used, but have restricted access; only
spiritual persons are allowed in the teepees. The camp is much more organized
than previous camps.
d. Protesters are discussing a new tactic of integrating into the communities instead
of forming camps so they are harder for law enforcement to identify and track.
Past 24 Hours
a. Maintained security at valves ND-280 to ND-430 using roving patrols.
b. Valve sites inspections:
Prepared for Energy Transfer Partners
1
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
The Highlights
Protesters have been discussing re-occupying U.S. Army Corp of Engineer property near the
Cannon Ball Ranch. The Cheyenne River camp is much more organized than previous camps.
Previous damage to the valves in South Dakota and Iowa are leading to new information with
possible leads coming from the Native Roots Group. We have sources in the camp working to
confirm this information.
The Details
1. NORTH DAKOTA
i.
ii.
TigerSwan
Intel Update
a. At approximately 1210 hrs. Morton County Sheriff’s Department found the body
of a deceased white Caucasian male on the shore line near the mouth of the
Cannon Ball River on U.S. Army Corp of Engineer land. This site is located just
south of the former OP3 on DAPL property. The male subject was identified as a
citizen of the Republic of Macedonia. Morton County was initially notified about
the body by three fishermen who were fishing in the area. The body appears to
have been in the water for quite some time.
a) Analyst Comment: This situation is still developing and will be updated as
more information is gathered. At this time, it is unknown if the deceased
was affiliated with the protests at Standing Rock.
b. Source Reporting - Protesters at the Cheyenne River Camp seem to be planning
for a large gathering of protesters in the near future. The camp will be used as a
staging area. Initial estimates state that 300 to 400 protesters may be returning to
the area in the coming weeks. Protesters have been discussing re-occupying U.S.
Army Corp of Engineer property near the Cannon Ball Ranch.
b) Analyst Comment: This situation will be closely monitored for any new
influx of protesters or new camps.
c. Source Reporting - Cheyenne River Camp near Cannonball, ND is welcoming to
newcomers. They are putting guests/camp workers up in the military tents,
which are all heated. The camp does not allow any live streaming or other social
media activity. The teepees are being used, but have restricted access; only
spiritual persons are allowed in the teepees. The camp is much more organized
than previous camps.
d. Protesters are discussing a new tactic of integrating into the communities instead
of forming camps so they are harder for law enforcement to identify and track.
Past 24 Hours
a. Maintained security at valves ND-280 to ND-430 using roving patrols.
b. Valve sites inspections:
Prepared for Energy Transfer Partners
1
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
ND-280:
Needs “No Trespassing” Signs, Red cattle gate at access road not installed
ND-290:
Needs “No Trespassing” Signs, Barb wire fence at access road
ND-300:
No barb wire fence around field or gate at access road
ND-310:
Needs “No Trespassing” Signs, Red cattle gate at access road not installed
ND-320:
Fence not secured to fence posts properly, highly unsecure
Needs “No Trespassing” Signs, no barb wire fence around field or gate at access
road, C-wire to be removed
ND-330:
Needs “No Trespassing” Signs, C-wire to be removed, Gaps on South side of
fence, Barb wire at access road
ND-340:
Needs “No Trespassing” Signs,
ND-345:
Needs “No Trespassing” Signs, wire to be removed
ND-350:
Needs “No Trespassing” Signs, wire to be removed, No cattle gate at access
road
ND-360:
Needs “No Trespassing” Signs, Wire was removed today, No cattle gate at
access road
ND-370:
Needs “No Trespassing” Signs, wire to be removed, No cattle gate at access
road
ND-380:
Gaps on East side of fence
ND-390:
All of the wire has been removed from the perimeter of HDD-E leaving the
valve exposed since it is not fenced yet. No fence, no gates, no locks, Needs
“No Trespassing” Signs
ND-L/R#2:
Large gaps under gates, Needs “No Trespassing” Signs
ND-400:
Gaps under gates and fence, Needs “No Trespassing” Signs
TigerSwan
Prepared for Energy Transfer Partners
2
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
ND-280:
Needs “No Trespassing” Signs, Red cattle gate at access road not installed
ND-290:
Needs “No Trespassing” Signs, Barb wire fence at access road
ND-300:
No barb wire fence around field or gate at access road
ND-310:
Needs “No Trespassing” Signs, Red cattle gate at access road not installed
ND-320:
Fence not secured to fence posts properly, highly unsecure
Needs “No Trespassing” Signs, no barb wire fence around field or gate at access
road, C-wire to be removed
ND-330:
Needs “No Trespassing” Signs, C-wire to be removed, Gaps on South side of
fence, Barb wire at access road
ND-340:
Needs “No Trespassing” Signs,
ND-345:
Needs “No Trespassing” Signs, wire to be removed
ND-350:
Needs “No Trespassing” Signs, wire to be removed, No cattle gate at access
road
ND-360:
Needs “No Trespassing” Signs, Wire was removed today, No cattle gate at
access road
ND-370:
Needs “No Trespassing” Signs, wire to be removed, No cattle gate at access
road
ND-380:
Gaps on East side of fence
ND-390:
All of the wire has been removed from the perimeter of HDD-E leaving the
valve exposed since it is not fenced yet. No fence, no gates, no locks, Needs
“No Trespassing” Signs
ND-L/R#2:
Large gaps under gates, Needs “No Trespassing” Signs
ND-400:
Gaps under gates and fence, Needs “No Trespassing” Signs
TigerSwan
Prepared for Energy Transfer Partners
2
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
iii.
ND-410:
Gaps under gates and fence, Needs “No Trespassing” Signs
ND-420:
Gaps under fence
ND-430:
Small Gaps under gate
Next 24 Hours
a. Continue monitoring of Open Source information, ISR feeds, and other sources of
information to provide accurate assessments of protester activities/migration
which may impact DAPL operations.
b. DAPL security will continue to rove the valve sites in North Dakota.
c. Michel’s continues restoration efforts at the HDDs. Approximately 2 weeks of
work remaining
2. IOWA
i.
Intel Update
a. Source reporting indicates arrival of more activists that participated in Standing
Rock, as well as activist groups arriving from Trans Pecos Pipeline camp and Sabal
trail camp arriving daily. Camp funds have expanded with the purchase of solar
cooking instruments and an unknown amount of supplies.
b.
visited Little
Creek Camp. He gave a speech about the importance of the camp in Iowa,
further suggesting the increasing popularity and potential political influence of
the camp.
a) He advocated the importance of environmental activism in Iowa because
Iowa gets national media attention because they have been first to
participate in the presidential caucuses since 1972. He claims this often
allows policy decisions made in IA to influence the country.
b) He further spoke about how environmental awareness brought through
press and media attention can slow policy decisions and bring public
pressure, even from out of state. He stated communities and
organizations concerned with environmental justice who gather (like
those in Little Creek Camp) can influence policy decisions that can protect
our shared interests
ii. Past 24 Hours
1) Iowa DAPL Security patrolled the ROW, assessed the condition and upgrades, and
interacted with the DAPL security force
2) Valve Site Inspections:
IA LR1:
Gaps from bottom of the fence to the ground, accessible. Commission follow-up for
pig/sig and TIT install. Free space under the permanent fence ranches from contact
TigerSwan
Prepared for Energy Transfer Partners
3
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
iii.
ND-410:
Gaps under gates and fence, Needs “No Trespassing” Signs
ND-420:
Gaps under fence
ND-430:
Small Gaps under gate
Next 24 Hours
a. Continue monitoring of Open Source information, ISR feeds, and other sources of
information to provide accurate assessments of protester activities/migration
which may impact DAPL operations.
b. DAPL security will continue to rove the valve sites in North Dakota.
c. Michel’s continues restoration efforts at the HDDs. Approximately 2 weeks of
work remaining
2. IOWA
i.
Intel Update
a. Source reporting indicates arrival of more activists that participated in Standing
Rock, as well as activist groups arriving from Trans Pecos Pipeline camp and Sabal
trail camp arriving daily. Camp funds have expanded with the purchase of solar
cooking instruments and an unknown amount of supplies.
b.
visited Little
Creek Camp. He gave a speech about the importance of the camp in Iowa,
further suggesting the increasing popularity and potential political influence of
the camp.
a) He advocated the importance of environmental activism in Iowa because
Iowa gets national media attention because they have been first to
participate in the presidential caucuses since 1972. He claims this often
allows policy decisions made in IA to influence the country.
b) He further spoke about how environmental awareness brought through
press and media attention can slow policy decisions and bring public
pressure, even from out of state. He stated communities and
organizations concerned with environmental justice who gather (like
those in Little Creek Camp) can influence policy decisions that can protect
our shared interests
ii. Past 24 Hours
1) Iowa DAPL Security patrolled the ROW, assessed the condition and upgrades, and
interacted with the DAPL security force
2) Valve Site Inspections:
IA LR1:
Gaps from bottom of the fence to the ground, accessible. Commission follow-up for
pig/sig and TIT install. Free space under the permanent fence ranches from contact
TigerSwan
Prepared for Energy Transfer Partners
3
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
distance to 9." The Main gate is secured with a chain and lock. There is no lock on the
inside hasp.
IA-LR2:
Temporary fence on site, requires grading and gravel, accessible.
IA-LR3:
Needs gravel and paint. All gates locked and secured, gaps at the bottom of fence,
area needs to have dirt leveled.
IA-LR4:
Permanent fence is installed with no apparent gaps, 1 posted sign, needs painting,
highly visible from the road. Fully commissioned, permanent fence, permanent power,
satellite installed with good signal. Handrails need to be installed to secure conduit.
Placed in production mode.
IA-11:
No gravel/foundation/platform, no posted trespassing signs in place, Electrical good,
External gate off road complete and locked, is accessible. Crew is bringing the VS to
grade. They should be finished here tomorrow afternoon and then work SE in
sequence to valve site 80.
IA-20:
Has a permanent fence with Barbwire on top. There is a temporary fence inside the
perimeter of the valve site surrounding the valve. The main gate is off its hinges. The
gate is secure with a chain and a lock. There is a meter box with the meter. There is no
platform. The free space under the back gate is approximately 2'4." Needs gravel,
platform in place, No posted signs on site.
IA-30:
Has a permanent fence with Barbwire on top. It has a temporary fence within the
perimeter of the valve surrounding the valve. There is no platform. There is no gravel.
The front gate is off its hinges. There is a meter box with the meter. The free space
under the fence is approximately one foot. The free space under the back drive
through gate is approximately 1 1/2 feet. Muddy but is accessible
IA-31:
Has a permanent fence with Barbwire on top. There is a temporary fence inside that
it's perimeter surrounding the valve site. There is no gravel. The gate is secure with the
chain and lock. There is a meter. There is no platform next to the valve. The free space
under the fence averages 1 foot. The free space under the two drive-through gates
averages almost a foot and a half. Is accessible
IA-40:
Temporary fencing, work crew on site to erect permanent fencing. Requires gravel,
surface conditions deem this site impassable. Commission follow-up after actuator
was replaced.
IA-60:
Has a permanent fence with Barbwire on top. There is a loose temporary fencing inside
of the valve site, which serves no security purpose. The front gate is not on its hinges,
TigerSwan
Prepared for Energy Transfer Partners
4
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
distance to 9." The Main gate is secured with a chain and lock. There is no lock on the
inside hasp.
IA-LR2:
Temporary fence on site, requires grading and gravel, accessible.
IA-LR3:
Needs gravel and paint. All gates locked and secured, gaps at the bottom of fence,
area needs to have dirt leveled.
IA-LR4:
Permanent fence is installed with no apparent gaps, 1 posted sign, needs painting,
highly visible from the road. Fully commissioned, permanent fence, permanent power,
satellite installed with good signal. Handrails need to be installed to secure conduit.
Placed in production mode.
IA-11:
No gravel/foundation/platform, no posted trespassing signs in place, Electrical good,
External gate off road complete and locked, is accessible. Crew is bringing the VS to
grade. They should be finished here tomorrow afternoon and then work SE in
sequence to valve site 80.
IA-20:
Has a permanent fence with Barbwire on top. There is a temporary fence inside the
perimeter of the valve site surrounding the valve. The main gate is off its hinges. The
gate is secure with a chain and a lock. There is a meter box with the meter. There is no
platform. The free space under the back gate is approximately 2'4." Needs gravel,
platform in place, No posted signs on site.
IA-30:
Has a permanent fence with Barbwire on top. It has a temporary fence within the
perimeter of the valve surrounding the valve. There is no platform. There is no gravel.
The front gate is off its hinges. There is a meter box with the meter. The free space
under the fence is approximately one foot. The free space under the back drive
through gate is approximately 1 1/2 feet. Muddy but is accessible
IA-31:
Has a permanent fence with Barbwire on top. There is a temporary fence inside that
it's perimeter surrounding the valve site. There is no gravel. The gate is secure with the
chain and lock. There is a meter. There is no platform next to the valve. The free space
under the fence averages 1 foot. The free space under the two drive-through gates
averages almost a foot and a half. Is accessible
IA-40:
Temporary fencing, work crew on site to erect permanent fencing. Requires gravel,
surface conditions deem this site impassable. Commission follow-up after actuator
was replaced.
IA-60:
Has a permanent fence with Barbwire on top. There is a loose temporary fencing inside
of the valve site, which serves no security purpose. The front gate is not on its hinges,
TigerSwan
Prepared for Energy Transfer Partners
4
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
however, it is secure with a chain and lock. There is no gravel. There is no platform
next to the valve. There is a meter. The free space under the fence is approximately 1
foot. The free space under the gate is approximately a foot and a half, is accessible.
IA-70:
Has permanent fencing With Barbwire on top. There is temporary fencing inside the
perimeter. There is no gravel. The back gate is not on its hinges. There is no platform
next to the Valve site. There is a meter box. The free space under the fence varies from
a few inches to over a foot and a half. The free space under the back gate is almost 3
feet, is accessible
IA-80:
Has a permanent fence with Barbwire on top. There's gravel from the road and
throughout the interior of the valve site. There is a platform next to the valve. There's
a meter box. There is no free space under the fence. The free Space under the gate is
only 1 to 2 inches in spots. The main gate is not hinged properly. Satellite has weak
signal.
IA-90:
Has a permanent fence. There is Gravel from the road and dispersed with in the
perimeter of the valve site. There is a platform next to the valve, there is a meter box.
There is no free space under the fence. There is only 1 to 2 inches of free space under
each gate. The back gate is not hinged correctly. Re-installed power conduit to
actuator. Installed PIT’s.
IA-100:
Has a permanent fence with Barbwire on top. There is gravel from the road and
throughout the interior of the valve site. The gravel has not been completely
disbursed. There is a meter box. There's a platform next to the valve. There's no free
space under the fence. The free space under the gates very from 3 inches to
approximately 1 foot with the back gate having the biggest gap. Unable to
communicate with satellite.
IA-110:
Permanent fence with gravel, the back drive through gate has approximately 12 inches
of free space.
IA-120:
Has a temporary fence with no Barbwire on top. The panels are connected at the base
with the stand and wired together at the top. The panels that operate as a gate are
secured with a lock and chain. The valve site has power, a platform and all is running
through it. There is no gravel anywhere inside the valve site area. UPS batteries down
and no permanent power. Satellite not yet installed.
IA-130:
Has temporary fencing with no Barbwire on top. There is a crush and run driveway that
leads up to the valve site. There is a limited amount of gravel within the temporary
fencing. The power is hooked up. There is a platform. The valve site has oil flowing
TigerSwan
Prepared for Energy Transfer Partners
5
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
however, it is secure with a chain and lock. There is no gravel. There is no platform
next to the valve. There is a meter. The free space under the fence is approximately 1
foot. The free space under the gate is approximately a foot and a half, is accessible.
IA-70:
Has permanent fencing With Barbwire on top. There is temporary fencing inside the
perimeter. There is no gravel. The back gate is not on its hinges. There is no platform
next to the Valve site. There is a meter box. The free space under the fence varies from
a few inches to over a foot and a half. The free space under the back gate is almost 3
feet, is accessible
IA-80:
Has a permanent fence with Barbwire on top. There's gravel from the road and
throughout the interior of the valve site. There is a platform next to the valve. There's
a meter box. There is no free space under the fence. The free Space under the gate is
only 1 to 2 inches in spots. The main gate is not hinged properly. Satellite has weak
signal.
IA-90:
Has a permanent fence. There is Gravel from the road and dispersed with in the
perimeter of the valve site. There is a platform next to the valve, there is a meter box.
There is no free space under the fence. There is only 1 to 2 inches of free space under
each gate. The back gate is not hinged correctly. Re-installed power conduit to
actuator. Installed PIT’s.
IA-100:
Has a permanent fence with Barbwire on top. There is gravel from the road and
throughout the interior of the valve site. The gravel has not been completely
disbursed. There is a meter box. There's a platform next to the valve. There's no free
space under the fence. The free space under the gates very from 3 inches to
approximately 1 foot with the back gate having the biggest gap. Unable to
communicate with satellite.
IA-110:
Permanent fence with gravel, the back drive through gate has approximately 12 inches
of free space.
IA-120:
Has a temporary fence with no Barbwire on top. The panels are connected at the base
with the stand and wired together at the top. The panels that operate as a gate are
secured with a lock and chain. The valve site has power, a platform and all is running
through it. There is no gravel anywhere inside the valve site area. UPS batteries down
and no permanent power. Satellite not yet installed.
IA-130:
Has temporary fencing with no Barbwire on top. There is a crush and run driveway that
leads up to the valve site. There is a limited amount of gravel within the temporary
fencing. The power is hooked up. There is a platform. The valve site has oil flowing
TigerSwan
Prepared for Energy Transfer Partners
5
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
through it. There is a lock and chain securing the temporary panels, which are being
used as the gate.
IA-140:
Temporary fence, no barbwire, no locks or chains to secure it. There is no gravel, there
is a meter box with no meter, no platform next to the valve. No permanent power.
IA-150:
Temporary fence on site, requires grading, gravel. Site is muddy but accessible.
IA-160:
Temporary fence on site, requires paint, gravel, grading. Site is muddy with some
standing water but is accessible
IA-170:
Temporary fence erected with posted signs. Requires gravel, grading, no platform, is
accessible. Crew spreading gravel today.
IA-180:
Temporary fence with posted signs, requires gravel, grading, very muddy, not
accessible beyond main road.
IA-190:
Has a crush and run driveway up to the valve site. The majority of the post for the
permanent fencing has been sent. The temporary fence is in shambles. There is a gap
between the panels of about 2 feet in the northwest corner. There is about a 40 feet
space where there is no temporary fencing or permanent fencing located on the
northeast side. There's no meter box, no platform, and no electricity hooked up.
Accessible.
IA-200:
Has crush and run gravel up to the main gate. There is no gravel inside the valve site.
There are two drive-through gates and one walk-through. There is approximately 1
foot of free space under the permanent fencing and approximately 1 1/2 feet of free
space under the drive through gate. There is a meter box with no meter. No platform
next to the valve. The electricity does not appear to be hooked up. Accessible.
IA-210:
Gaps between the fence and ground, requires gravel, ground is currently flooded, but
is accessible, no permanent power
IA-220:
Has permanent fence with barbwire on top. A crush and run driveway up to the main
gate. There is no gravel inside the fencing. The drive through gates have fencing
extended to the ground, which eliminates the free space under them. The free space
under the fence ranges from a few inches to aprox one foot. There is a meter box with
no meter. There is a platform next to the valve. Requires gravel, currently flooded, but
accessible. Satellite is not connected and paint on EIM is pealing. Has permanent
power.
IA-230:
TigerSwan
Prepared for Energy Transfer Partners
6
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
through it. There is a lock and chain securing the temporary panels, which are being
used as the gate.
IA-140:
Temporary fence, no barbwire, no locks or chains to secure it. There is no gravel, there
is a meter box with no meter, no platform next to the valve. No permanent power.
IA-150:
Temporary fence on site, requires grading, gravel. Site is muddy but accessible.
IA-160:
Temporary fence on site, requires paint, gravel, grading. Site is muddy with some
standing water but is accessible
IA-170:
Temporary fence erected with posted signs. Requires gravel, grading, no platform, is
accessible. Crew spreading gravel today.
IA-180:
Temporary fence with posted signs, requires gravel, grading, very muddy, not
accessible beyond main road.
IA-190:
Has a crush and run driveway up to the valve site. The majority of the post for the
permanent fencing has been sent. The temporary fence is in shambles. There is a gap
between the panels of about 2 feet in the northwest corner. There is about a 40 feet
space where there is no temporary fencing or permanent fencing located on the
northeast side. There's no meter box, no platform, and no electricity hooked up.
Accessible.
IA-200:
Has crush and run gravel up to the main gate. There is no gravel inside the valve site.
There are two drive-through gates and one walk-through. There is approximately 1
foot of free space under the permanent fencing and approximately 1 1/2 feet of free
space under the drive through gate. There is a meter box with no meter. No platform
next to the valve. The electricity does not appear to be hooked up. Accessible.
IA-210:
Gaps between the fence and ground, requires gravel, ground is currently flooded, but
is accessible, no permanent power
IA-220:
Has permanent fence with barbwire on top. A crush and run driveway up to the main
gate. There is no gravel inside the fencing. The drive through gates have fencing
extended to the ground, which eliminates the free space under them. The free space
under the fence ranges from a few inches to aprox one foot. There is a meter box with
no meter. There is a platform next to the valve. Requires gravel, currently flooded, but
accessible. Satellite is not connected and paint on EIM is pealing. Has permanent
power.
IA-230:
TigerSwan
Prepared for Energy Transfer Partners
6
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Has a permanent fence with barbwire on top. There is limited gravel from the road to
the main gate. No gravel inside. The free space under the fence averages 1.5 feet.
There is a meter and the valve has a platform next to it. Smoke detector needs to be
replaced. Actuators swapped on valve. Muddy, but is accessible.
IA-240:
Generator on site in order to provide power. Slight flooding in the area, but is
accessible. Satellite is functioning but has a weak signal. Fence needs to be repaired.
Top 2 strands of barbed wire are broken. DAPL security arrived on site and inspected
barbed wires and no evidence that wires were cut is present. Landowner is a plaintiff
in the eminent domain lawsuit.
IA-250:
Has a permanent fence with a temporary fence outside of it. There is gravel from the
road to the main fence with a very limited amount of gravel inside the wire. There is a
meter box with no meter. A platform is next to the valve. The VS has a fair amount of
standing water inside it. There is a mobile generator inside the wire. More gravel is
needed inside the fence, the free space is about one foot under the gates. Satellite is
functioning with a good signal. Remote/Local switch board was bad in the actuator and
we replaced it on site. Is accessible.
IA-260:
Has limited gravel from the road to the main gate. There is a permanent fence with
Barbwire on top. There is no gravel inside. There is a platform next to the valve.
There's a meter box with a meter. The electricity appears to be connected. The free
Space under the fence varies from 6 inches to 1 foot. The free space under the gates is
almost 2 feet. Satellite is not connected. Muddy, but is accessible.
IA-270:
Has permanent power, connected satellite onsite and has a good signal, placed
production mode. Has a permanent fence with Barbwire on top. There is gravel from
the road and throughout the valve site. Free space under the fence varies from 4
inches over 18 inches. The free space under the gate is just under 16 inches in some
spots. There is a meter box which contains a meter. There is a platform beside the
valve. The main gate can easily be breached by unscrewing the two bolts of the U-bolt.
Is accessible. NOTE: There is a bale of hay in the middle of the valve site.
IA-280:
Has a permanent fence with Barbwire on top. There is gravel from the road and
throughout the valve site. The free space underneath the fence varies from a few
inches over a foot. The north-east corner in the southwest corner been the worst. Free
space under the gates are just under 1 foot. There is a platform next to the valve.
There is a meter box with a meter. These gates can easily be breached by removing the
two nuts which hold on The U-bolt. Is accessible
IA-281:
TigerSwan
Prepared for Energy Transfer Partners
7
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Has a permanent fence with barbwire on top. There is limited gravel from the road to
the main gate. No gravel inside. The free space under the fence averages 1.5 feet.
There is a meter and the valve has a platform next to it. Smoke detector needs to be
replaced. Actuators swapped on valve. Muddy, but is accessible.
IA-240:
Generator on site in order to provide power. Slight flooding in the area, but is
accessible. Satellite is functioning but has a weak signal. Fence needs to be repaired.
Top 2 strands of barbed wire are broken. DAPL security arrived on site and inspected
barbed wires and no evidence that wires were cut is present. Landowner is a plaintiff
in the eminent domain lawsuit.
IA-250:
Has a permanent fence with a temporary fence outside of it. There is gravel from the
road to the main fence with a very limited amount of gravel inside the wire. There is a
meter box with no meter. A platform is next to the valve. The VS has a fair amount of
standing water inside it. There is a mobile generator inside the wire. More gravel is
needed inside the fence, the free space is about one foot under the gates. Satellite is
functioning with a good signal. Remote/Local switch board was bad in the actuator and
we replaced it on site. Is accessible.
IA-260:
Has limited gravel from the road to the main gate. There is a permanent fence with
Barbwire on top. There is no gravel inside. There is a platform next to the valve.
There's a meter box with a meter. The electricity appears to be connected. The free
Space under the fence varies from 6 inches to 1 foot. The free space under the gates is
almost 2 feet. Satellite is not connected. Muddy, but is accessible.
IA-270:
Has permanent power, connected satellite onsite and has a good signal, placed
production mode. Has a permanent fence with Barbwire on top. There is gravel from
the road and throughout the valve site. Free space under the fence varies from 4
inches over 18 inches. The free space under the gate is just under 16 inches in some
spots. There is a meter box which contains a meter. There is a platform beside the
valve. The main gate can easily be breached by unscrewing the two bolts of the U-bolt.
Is accessible. NOTE: There is a bale of hay in the middle of the valve site.
IA-280:
Has a permanent fence with Barbwire on top. There is gravel from the road and
throughout the valve site. The free space underneath the fence varies from a few
inches over a foot. The north-east corner in the southwest corner been the worst. Free
space under the gates are just under 1 foot. There is a platform next to the valve.
There is a meter box with a meter. These gates can easily be breached by removing the
two nuts which hold on The U-bolt. Is accessible
IA-281:
TigerSwan
Prepared for Energy Transfer Partners
7
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Has a permanent fence with Barbwire on top. Gravel from the road and throughout
the valve site. The free space under the fence varies from a few inches to approx. six
inches. There is a meter. The electricity seems to be hooked up. There is a platform
next to the valve. The main gate can easily be breached by unscrewing the two nuts
which hold the U-bolt. Has permanent power, Satellite not connected, needs shrink
wrap on PIT posts. Placed in production mode. Is accessible.
IA-290:
Has permanent fence with barbwire on top. There is gravel from the road and threw
out the valve site except in the south east corner. The free space under the fence
varies from a few inches over 1 foot. There is a meter box. There is a platform next to
the valve. Permanent power, satellite not connected, light in RTU not working. Padlock
on gate may be unsecure. By removing the two nuts on the gate, one can easily open
it. Placed in production mode. Is accessible
IA-300:
Has a permanent fence with Barbwire on top. There's gravel dispersed inside the
perimeter except in the south west corner. There is a meter box with no meter in it.
There's a platform next to the valve. The electricity appears to be hooked up. There is
free space under the fence from a few inches over 1 foot. The free space under the
drive-through Gates is approximately 1 foot. Gaps underneath the fencing, front and
rear sliding gates, ranging from 2” to 2’. Power not installed, requires gravel in NW
corner of the site. Has a large drop dumpster in the driveway, which is blocking the
main gate from vehicle traffic. Accessible.
IA-310:
Has permanent power, permanent fencing, Satellite not connected. Placed in
production mode. Gaps in the permanent fence ranging from a few inches to 18”, with
the worst gaps being in the SE and NW corners. SE corner also requires gravel.
Accessible
IA-320
Gaps along the fence to the ground, needs gravel work. Accessible
IA-330:
Gravel Required, Multiple posted signs, no locks on gates, no electrical, grounding
done, Huge gate/fence gaps (24"+), is accessible
IA-340:
No electrical, grounding work done, Front gate gap 8-10", Multiple posted signs and is
accessible
IA-350:
Weak Satellite signal, no lock, Secondary farm barbed wire fence/gate locked, no
electrical, but ground is done, Multiple posted signs and is accessible. Tech on site
today to work on satellite connectivity.
IA-360
TigerSwan
Prepared for Energy Transfer Partners
8
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Has a permanent fence with Barbwire on top. Gravel from the road and throughout
the valve site. The free space under the fence varies from a few inches to approx. six
inches. There is a meter. The electricity seems to be hooked up. There is a platform
next to the valve. The main gate can easily be breached by unscrewing the two nuts
which hold the U-bolt. Has permanent power, Satellite not connected, needs shrink
wrap on PIT posts. Placed in production mode. Is accessible.
IA-290:
Has permanent fence with barbwire on top. There is gravel from the road and threw
out the valve site except in the south east corner. The free space under the fence
varies from a few inches over 1 foot. There is a meter box. There is a platform next to
the valve. Permanent power, satellite not connected, light in RTU not working. Padlock
on gate may be unsecure. By removing the two nuts on the gate, one can easily open
it. Placed in production mode. Is accessible
IA-300:
Has a permanent fence with Barbwire on top. There's gravel dispersed inside the
perimeter except in the south west corner. There is a meter box with no meter in it.
There's a platform next to the valve. The electricity appears to be hooked up. There is
free space under the fence from a few inches over 1 foot. The free space under the
drive-through Gates is approximately 1 foot. Gaps underneath the fencing, front and
rear sliding gates, ranging from 2” to 2’. Power not installed, requires gravel in NW
corner of the site. Has a large drop dumpster in the driveway, which is blocking the
main gate from vehicle traffic. Accessible.
IA-310:
Has permanent power, permanent fencing, Satellite not connected. Placed in
production mode. Gaps in the permanent fence ranging from a few inches to 18”, with
the worst gaps being in the SE and NW corners. SE corner also requires gravel.
Accessible
IA-320
Gaps along the fence to the ground, needs gravel work. Accessible
IA-330:
Gravel Required, Multiple posted signs, no locks on gates, no electrical, grounding
done, Huge gate/fence gaps (24"+), is accessible
IA-340:
No electrical, grounding work done, Front gate gap 8-10", Multiple posted signs and is
accessible
IA-350:
Weak Satellite signal, no lock, Secondary farm barbed wire fence/gate locked, no
electrical, but ground is done, Multiple posted signs and is accessible. Tech on site
today to work on satellite connectivity.
IA-360
TigerSwan
Prepared for Energy Transfer Partners
8
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Permanent power, permanent fence, needs rock, satellite installed with good signal.
Placed in production mode. Requires gravel, large gaps in excess of 12" at the drive in,
gates locked, accessible
IA-370:
Permanent power, permanent fence. Repairs made on satellite today to fix poor
signal. Rock is needed on power side of RTU. Placed in production mode Drive gates
locked, walk in gate chained and locked. Gauges in place. Gaps ranging from 6"-24"
atriums perimeter of the fence.
IA-380:
Permanent power, permanent fence, satellite installed with good signal. Placed in
production mode. Large fence/gate gaps 8"+, 1 posted sign, walking gate unlocked,
requires gravel in the SW corner, accessible. Waste management dumpster on site.
IA-390:
Permanent power, permanent fence satellite installed with a good signal, needs rock
on power side of RTU. Placed in production mode. Large fence/gate gap in rear 8"+, 1
posted sign, accessible. E&I Inspector on site, expecting contractors on site to repair
connectivity with Houston
IA-400:
Permanent power, permanent fence. Repairs made on satellite today to fix poor signal.
Placed in production mode. 25m off very unimproved dirt road, difficult to access,
large gap at back fence and gate, front about 4"
IA-410:
Permanent power, permanent fence. Satellite installed, good signal. 15m off very
unimproved dirt road, extremely difficult to access without 4wd. Front gate gap about
6", 1 posted sign
IA-420:
Permanent power, permanent fence, satellite installed with good signal. Placed in
production mode. Large gap on back gate, accessible
IA-430:
Permanent power, permanent fence, satellite installed with good signal. Placed in
production mode. Permanent fencing has been replaced from having it down for
pipeline repair due to vandalism, is accessible
IA-440:
Permanent power, permanent fence, satellite installed with good signal. Removed UPS
charger to place in IA430. Possibly not in production mode due to UPS. Big gate gaps, it
is grounded, Not too remote, 25m off backroad, locked, accessible
IA-450:
Small gaps in the permanent fencing, access road requires 4wd, unimproved road, 1
posted sign, Visible from Hwy 23/149, locked. Satellite installed, good signal.
IA-451:
TigerSwan
Prepared for Energy Transfer Partners
9
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Permanent power, permanent fence, needs rock, satellite installed with good signal.
Placed in production mode. Requires gravel, large gaps in excess of 12" at the drive in,
gates locked, accessible
IA-370:
Permanent power, permanent fence. Repairs made on satellite today to fix poor
signal. Rock is needed on power side of RTU. Placed in production mode Drive gates
locked, walk in gate chained and locked. Gauges in place. Gaps ranging from 6"-24"
atriums perimeter of the fence.
IA-380:
Permanent power, permanent fence, satellite installed with good signal. Placed in
production mode. Large fence/gate gaps 8"+, 1 posted sign, walking gate unlocked,
requires gravel in the SW corner, accessible. Waste management dumpster on site.
IA-390:
Permanent power, permanent fence satellite installed with a good signal, needs rock
on power side of RTU. Placed in production mode. Large fence/gate gap in rear 8"+, 1
posted sign, accessible. E&I Inspector on site, expecting contractors on site to repair
connectivity with Houston
IA-400:
Permanent power, permanent fence. Repairs made on satellite today to fix poor signal.
Placed in production mode. 25m off very unimproved dirt road, difficult to access,
large gap at back fence and gate, front about 4"
IA-410:
Permanent power, permanent fence. Satellite installed, good signal. 15m off very
unimproved dirt road, extremely difficult to access without 4wd. Front gate gap about
6", 1 posted sign
IA-420:
Permanent power, permanent fence, satellite installed with good signal. Placed in
production mode. Large gap on back gate, accessible
IA-430:
Permanent power, permanent fence, satellite installed with good signal. Placed in
production mode. Permanent fencing has been replaced from having it down for
pipeline repair due to vandalism, is accessible
IA-440:
Permanent power, permanent fence, satellite installed with good signal. Removed UPS
charger to place in IA430. Possibly not in production mode due to UPS. Big gate gaps, it
is grounded, Not too remote, 25m off backroad, locked, accessible
IA-450:
Small gaps in the permanent fencing, access road requires 4wd, unimproved road, 1
posted sign, Visible from Hwy 23/149, locked. Satellite installed, good signal.
IA-451:
TigerSwan
Prepared for Energy Transfer Partners
9
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Permanent power, permanent fence satellite installed with a good signal. Placed in
production mode. Unlocked, decent spacing between the gate and ground on the front
and rear gate, area around the valve site flooded
IA-460
Permanent power, permanent fence, satellite installed with good signal. Needs rock on
power side of RTU. Placed in production mode. Needs lock on pedestrian gate. Needs
grounding and wiring. Decent spacing between the gate and ground on the front and
rear gate, accessible
IA-470:
Gates installed properly, but fence has huge gap on 3 of 4 sides, ranging from 12” to
24”, No posted signs, is accessible
IA-480:
Permanent power, permanent fence satellite installed with a good signal. Placed in
production mode. Large 18”-25” gaps under gates, Locked, 1 posted sign, accessible
IA-490:
Gate installed incorrectly, large gaps at the bottom, locked, partially flooded but
accessible
IA-500:
No pipe platform, no electrical grounding, all locked, 1 posted sign, partially flooded
but accessible
IA-510:
Permanent power, permanent fence, satellite installed with good signal. Needs rock on
power side of RTU. Platform needs to be installed. Placed in production mode. Gaps
found along the permanent fence, no pipe platform, 50m off dirt/gravel road in view of
1-2 farms, site is flooded, but accessible
IA-520:
Permanent power, permanent fence satellite installed with a good signal, needs rock
on power side of RTU. Platform needs to be installed. Placed in production mode.
Gates have large gaps, site is located down mud access road, then 10m gravel road,
well hidden, wet weather hinders access. (inaccessible today), Locked
IA-530:
Permanent power, permanent fence, satellite installed with good signal. Needs rock on
power side of RTU. Drive gates need to be adjusted. Placed in production mode. Gaps
between fencing and the ground, CIS Inspector on site
IA-540:
Permanent power, permanent fence satellite installed with a good signal, needs rock
on power side of RTU. Placed in production mode. Gaps between permanent fence
and ground, Locked
IA-550
Permanent power, permanent fence, satellite not connected, needs rock on power
side of RTU. Corr-Pro was onsite drilling for cathodic. VSAT is CABLE NOT installed; site
TigerSwan
Prepared for Energy Transfer Partners
10
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Permanent power, permanent fence satellite installed with a good signal. Placed in
production mode. Unlocked, decent spacing between the gate and ground on the front
and rear gate, area around the valve site flooded
IA-460
Permanent power, permanent fence, satellite installed with good signal. Needs rock on
power side of RTU. Placed in production mode. Needs lock on pedestrian gate. Needs
grounding and wiring. Decent spacing between the gate and ground on the front and
rear gate, accessible
IA-470:
Gates installed properly, but fence has huge gap on 3 of 4 sides, ranging from 12” to
24”, No posted signs, is accessible
IA-480:
Permanent power, permanent fence satellite installed with a good signal. Placed in
production mode. Large 18”-25” gaps under gates, Locked, 1 posted sign, accessible
IA-490:
Gate installed incorrectly, large gaps at the bottom, locked, partially flooded but
accessible
IA-500:
No pipe platform, no electrical grounding, all locked, 1 posted sign, partially flooded
but accessible
IA-510:
Permanent power, permanent fence, satellite installed with good signal. Needs rock on
power side of RTU. Platform needs to be installed. Placed in production mode. Gaps
found along the permanent fence, no pipe platform, 50m off dirt/gravel road in view of
1-2 farms, site is flooded, but accessible
IA-520:
Permanent power, permanent fence satellite installed with a good signal, needs rock
on power side of RTU. Platform needs to be installed. Placed in production mode.
Gates have large gaps, site is located down mud access road, then 10m gravel road,
well hidden, wet weather hinders access. (inaccessible today), Locked
IA-530:
Permanent power, permanent fence, satellite installed with good signal. Needs rock on
power side of RTU. Drive gates need to be adjusted. Placed in production mode. Gaps
between fencing and the ground, CIS Inspector on site
IA-540:
Permanent power, permanent fence satellite installed with a good signal, needs rock
on power side of RTU. Placed in production mode. Gaps between permanent fence
and ground, Locked
IA-550
Permanent power, permanent fence, satellite not connected, needs rock on power
side of RTU. Corr-Pro was onsite drilling for cathodic. VSAT is CABLE NOT installed; site
TigerSwan
Prepared for Energy Transfer Partners
10
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
skipped due to Corrpro drilling on site. Placed in production. Large gap at the front
gate, locked, accessible, currently flooded
IA-560:
Permanent power, permanent fence satellite installed with a good signal, needs rock
on power side of RTU. Placed in production mode.50m off dirt road, visible (150m
from main Hwy 218), visible by 5-7 local houses, locked, accessible
IA-570:
Permanent power, permanent fence, satellite installed with good signal. Needs rock on
per side of RTU. Drive gates need to be adjusted. Placed in production mode. Locked
secondary fence/farm gate, barb wire, all equipment installed, 25m off dirt road,
visible from main Hwy 218. Requires gravel work. Area around the site is
muddy/flooded, but is accessible
IA-580:
Permanent power, permanent fence, satellite installed with poor signal. Needs rock on
power side of RTU. Needs 24v adapter for Cisco. Placed in production mode. Gap on
corner of fence, and large gap, front gate, all gear/gates locked, Visible from main
highway (Hwy 218/61) on back side, requires gravel work
IA-590:
Permanent power, permanent fence, satellite installed with good signal. Cisco
needs 24v adapter. Needs rock on power side of RTU. Gate needs to be adjusted.
Placed in production mode. Large gap on west gate, area well hidden from plain
site/ main highways, but in view of two local houses All gates, boxes, doors locked,
accessible
iii.
Next 24 Hours
a. Continued monitoring of Open Source information, ISR feeds, and other sources
of information to provide accurate assessments of protester activities/migration
which may impact DAPL operations.
b. DAPL security will continue to rove the valve sites in Iowa. Continue to have the
field managers patrol the ROW, access security and validate ROW upgrades
conducted. Assist and mentor DAPL security personnel as required
3. SOUTH DAKOTA
i.
TigerSwan
Intel Update
a. DOI 9 APR 17South Dakota camps will see growth over the next 2 weeks, with groups arriving
to white river and Takiya (Native Roots) camp from Colorado and Cheyenne, WY
areas. Numbers over the next few days will increase to at approximately 10
adults, and accompanying children to a White River camp. Agitators with "Rolling
Resistance" will travel from Colorado to South Dakota, spending time in eagle
butte, SD with the possibility of continuing to Flint, MI. This is the location of a
Prepared for Energy Transfer Partners
11
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
skipped due to Corrpro drilling on site. Placed in production. Large gap at the front
gate, locked, accessible, currently flooded
IA-560:
Permanent power, permanent fence satellite installed with a good signal, needs rock
on power side of RTU. Placed in production mode.50m off dirt road, visible (150m
from main Hwy 218), visible by 5-7 local houses, locked, accessible
IA-570:
Permanent power, permanent fence, satellite installed with good signal. Needs rock on
per side of RTU. Drive gates need to be adjusted. Placed in production mode. Locked
secondary fence/farm gate, barb wire, all equipment installed, 25m off dirt road,
visible from main Hwy 218. Requires gravel work. Area around the site is
muddy/flooded, but is accessible
IA-580:
Permanent power, permanent fence, satellite installed with poor signal. Needs rock on
power side of RTU. Needs 24v adapter for Cisco. Placed in production mode. Gap on
corner of fence, and large gap, front gate, all gear/gates locked, Visible from main
highway (Hwy 218/61) on back side, requires gravel work
IA-590:
Permanent power, permanent fence, satellite installed with good signal. Cisco
needs 24v adapter. Needs rock on power side of RTU. Gate needs to be adjusted.
Placed in production mode. Large gap on west gate, area well hidden from plain
site/ main highways, but in view of two local houses All gates, boxes, doors locked,
accessible
iii.
Next 24 Hours
a. Continued monitoring of Open Source information, ISR feeds, and other sources
of information to provide accurate assessments of protester activities/migration
which may impact DAPL operations.
b. DAPL security will continue to rove the valve sites in Iowa. Continue to have the
field managers patrol the ROW, access security and validate ROW upgrades
conducted. Assist and mentor DAPL security personnel as required
3. SOUTH DAKOTA
i.
TigerSwan
Intel Update
a. DOI 9 APR 17South Dakota camps will see growth over the next 2 weeks, with groups arriving
to white river and Takiya (Native Roots) camp from Colorado and Cheyenne, WY
areas. Numbers over the next few days will increase to at approximately 10
adults, and accompanying children to a White River camp. Agitators with "Rolling
Resistance" will travel from Colorado to South Dakota, spending time in eagle
butte, SD with the possibility of continuing to Flint, MI. This is the location of a
Prepared for Energy Transfer Partners
11
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
newly opened camp, resulting from the water crisis in that municipality. Rolling
Resistance is a suspected source of the valve attacks in IA and SD. Facebook page
of Native Roots camp in SD:
https://www.facebook.com/baldeagleprayergathering/
ii. Past 24 Hours
1) DAPL valve inspectors conducted oversight on SD valves throughout the state, varying
routes to valve sites as well as times at each site.
2) Maintained oversight on DAPL security and roving personnel to ensure standards are
being met.
Valve Site Inspections:
SD-10:
Satellite dish unplugged, Gaps at base in fencing on east side of valve site, Lock
mechanism for front and pedestrian gate unfinished
SD-20:
Satellite dish unplugged
SD-30:
Dirt that was excavated needs leveling
SD-40:
Dirt that was excavated needs leveling
SD-50:
Dirt that was excavated needs leveling
SD-LR1:
Could not locate trail cams, Needs “No Trespassing” signs
SD-55:
No Trail Cam, Dirt that was excavated needs leveling
SD-60:
Large gaps in Pedestrian and Rear gates
SD-65:
No trail cam
SD-80:
No trail cam, Satellite dish unplugged
SD-90:
No trail cam
SD-95:
No trail cam
SD-100:
No trail cam
SD-110:
No trail cam, Satellite dish unplugged
TigerSwan
Prepared for Energy Transfer Partners
12
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
newly opened camp, resulting from the water crisis in that municipality. Rolling
Resistance is a suspected source of the valve attacks in IA and SD. Facebook page
of Native Roots camp in SD:
https://www.facebook.com/baldeagleprayergathering/
ii. Past 24 Hours
1) DAPL valve inspectors conducted oversight on SD valves throughout the state, varying
routes to valve sites as well as times at each site.
2) Maintained oversight on DAPL security and roving personnel to ensure standards are
being met.
Valve Site Inspections:
SD-10:
Satellite dish unplugged, Gaps at base in fencing on east side of valve site, Lock
mechanism for front and pedestrian gate unfinished
SD-20:
Satellite dish unplugged
SD-30:
Dirt that was excavated needs leveling
SD-40:
Dirt that was excavated needs leveling
SD-50:
Dirt that was excavated needs leveling
SD-LR1:
Could not locate trail cams, Needs “No Trespassing” signs
SD-55:
No Trail Cam, Dirt that was excavated needs leveling
SD-60:
Large gaps in Pedestrian and Rear gates
SD-65:
No trail cam
SD-80:
No trail cam, Satellite dish unplugged
SD-90:
No trail cam
SD-95:
No trail cam
SD-100:
No trail cam
SD-110:
No trail cam, Satellite dish unplugged
TigerSwan
Prepared for Energy Transfer Partners
12
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
SD-LR2:
Could not locate trail cams
SD-120:
Opening in fence on southwest corner near cattle gate, No trail cam
SD-130:
No trail cam
SD-135:
Permanent fence has large gaps all along the bottom, Opening in fence on east
side of cattle gate, No trail cam, Satellite dish unplugged, Needs graveling
SD-140:
No trail cam, Needs graveling, Opening in fence 50m west side of cattle
gate
SD-150:
No Trail Cam
SD-160:
Needs graveling
SD-170:
Needs graveling
SD-180:
Temporary fence, Permanent fence being installed, Needs graveling
SD-185:
Needs graveling
SD-190:
Temporary fence, Permanent fence being installed, Needs graveling
SD-200:
Temporary fence, Permanent fence being installed, Needs graveling, Fence crew on
site (4/8)
SD-210:
Temporary fence, Permanent fence post on site, Needs graveling
SD-220:
Temporary fence, Permanent Fence being installed, Needs graveling
SD-230:
Temporary fence, Permanent Fence being installed
SD-240:
Temporary Fence, Permanent Fence being installed
SD-245:
Temporary Fence, Permanent Fence being installed
SD-250:
TigerSwan
Prepared for Energy Transfer Partners
13
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
SD-LR2:
Could not locate trail cams
SD-120:
Opening in fence on southwest corner near cattle gate, No trail cam
SD-130:
No trail cam
SD-135:
Permanent fence has large gaps all along the bottom, Opening in fence on east
side of cattle gate, No trail cam, Satellite dish unplugged, Needs graveling
SD-140:
No trail cam, Needs graveling, Opening in fence 50m west side of cattle
gate
SD-150:
No Trail Cam
SD-160:
Needs graveling
SD-170:
Needs graveling
SD-180:
Temporary fence, Permanent fence being installed, Needs graveling
SD-185:
Needs graveling
SD-190:
Temporary fence, Permanent fence being installed, Needs graveling
SD-200:
Temporary fence, Permanent fence being installed, Needs graveling, Fence crew on
site (4/8)
SD-210:
Temporary fence, Permanent fence post on site, Needs graveling
SD-220:
Temporary fence, Permanent Fence being installed, Needs graveling
SD-230:
Temporary fence, Permanent Fence being installed
SD-240:
Temporary Fence, Permanent Fence being installed
SD-245:
Temporary Fence, Permanent Fence being installed
SD-250:
TigerSwan
Prepared for Energy Transfer Partners
13
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
iii.
Temporary Fence, Permanent Fence being installed
SD-260:
Temporary Fence, Permanent Fence being installed
SD-265:
Temporary Fence, Permanent fence being installed, Fence crew on site (4/9),
Needs graveling
SD-270:
Temporary Fence, Permanent fence being installed, Fence crew on site (4/9),
Needs graveling
SD-280:
Temporary Fence, Permanent fence being installed, Needs graveling
SD-290:
Needs graveling
SD-300:
Needs graveling
SD-305:
Needs graveling, Valve not coated
Next 24 Hours
a. Conduct all business with safety as the rainy season is upon us.
b. Continue to rove the valve sites in South Dakota, monitoring roving posts
throughout South Dakota as per requirement.
4. ILLINOIS
i.
TigerSwan
Intel Update
a. Bottom-line: The current efforts and preparations of the Illinois environmental
activists indicate the potential for large scale demonstrations against DAPL and
other pipeline projects, (ETP and others) is probable. Chicago is a key indicator of
the ongoing rise of the progressive movement and the hub of financial support
for that movement. The current organizational efforts are highly disciplined and
are applying lessons learned from the DAPL project against future efforts. This
foresight, discipline, vast financial resources, professional organizers of groups
like Food and Water Watch, with no industry counter IO campaign will lead to
numerous unforeseen delays and cost over runs to ongoing and future projects.
The success of these demonstrations will set the conditions for more aggressive
direct action efforts.
b. Food and Water Watch continues to make a strong push for their sponsored
protest in 29 April 2017. This march will simultaneously be held in multiple
locations; the principle location being Washington D.C. Food and water Watch is
spending an exorbitant amount of time and money to facilitate transportation
from Chicago to Washington DC, as well as supporting that march with a local
march in Chicago. The demonstration is being called the People’s Climate March.
Prepared for Energy Transfer Partners
14
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
iii.
Temporary Fence, Permanent Fence being installed
SD-260:
Temporary Fence, Permanent Fence being installed
SD-265:
Temporary Fence, Permanent fence being installed, Fence crew on site (4/9),
Needs graveling
SD-270:
Temporary Fence, Permanent fence being installed, Fence crew on site (4/9),
Needs graveling
SD-280:
Temporary Fence, Permanent fence being installed, Needs graveling
SD-290:
Needs graveling
SD-300:
Needs graveling
SD-305:
Needs graveling, Valve not coated
Next 24 Hours
a. Conduct all business with safety as the rainy season is upon us.
b. Continue to rove the valve sites in South Dakota, monitoring roving posts
throughout South Dakota as per requirement.
4. ILLINOIS
i.
TigerSwan
Intel Update
a. Bottom-line: The current efforts and preparations of the Illinois environmental
activists indicate the potential for large scale demonstrations against DAPL and
other pipeline projects, (ETP and others) is probable. Chicago is a key indicator of
the ongoing rise of the progressive movement and the hub of financial support
for that movement. The current organizational efforts are highly disciplined and
are applying lessons learned from the DAPL project against future efforts. This
foresight, discipline, vast financial resources, professional organizers of groups
like Food and Water Watch, with no industry counter IO campaign will lead to
numerous unforeseen delays and cost over runs to ongoing and future projects.
The success of these demonstrations will set the conditions for more aggressive
direct action efforts.
b. Food and Water Watch continues to make a strong push for their sponsored
protest in 29 April 2017. This march will simultaneously be held in multiple
locations; the principle location being Washington D.C. Food and water Watch is
spending an exorbitant amount of time and money to facilitate transportation
from Chicago to Washington DC, as well as supporting that march with a local
march in Chicago. The demonstration is being called the People’s Climate March.
Prepared for Energy Transfer Partners
14
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
This event is anticipated to be a very large local march and will have a large group
of Anti DAPL/Anti Pipeline marchers.
https://www.facebook.com/events/263200760768048/
http://chicagoactivism.org/events/peoples-climate-march-chicago-2/
c. Food and Water Watch is intent on making a large scale statement at both their
local and Washington DC demonstrations on April 29, 2017. The organization is
expending a large amount of resources and through a very organized and
disciplined strategic messaging campaign, interest and participation is growing
rapidly. Efforts such as the People's Climate March Chicago Phone Banks continue
to drive interest throughout Chicago and across all of Illinois. Participating
organizations such as several NoDAPL efforts are putting the full force of their
grass roots efforts behind this march. The effort and resource expenditures being
placed behind this demonstration giving it the potential for a high payoff media
event.
https://www.facebook.com/events/397261833981670/
https://www.facebook.com/events/282163125540949/
d. CA panel discussion as an effort to maintain the “activist narrative” of the “Water
Protectors” will be held on 13 April 2017, in Chicago. Chi-Nations Youth Council is
sponsoring the event. Chi-Nations Youth Council is a strong supporter of
and her narrative, splitting them away from the Standing Rock Tribal leadership.
This is a continuing effort to maintain a native face to the Anti-DAPL/Water
Protector Movement in the Chicago area.
http://chicagoactivism.org/events/standing-in-solidarity-with-water-protectors-2/
e. Chicago Organizers from outside of the FFW are lending their efforts in support of
the 29 April as well as other future demonstrations in the Chicago Area.
TigerSwan
Prepared for Energy Transfer Partners
15
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
This event is anticipated to be a very large local march and will have a large group
of Anti DAPL/Anti Pipeline marchers.
https://www.facebook.com/events/263200760768048/
http://chicagoactivism.org/events/peoples-climate-march-chicago-2/
c. Food and Water Watch is intent on making a large scale statement at both their
local and Washington DC demonstrations on April 29, 2017. The organization is
expending a large amount of resources and through a very organized and
disciplined strategic messaging campaign, interest and participation is growing
rapidly. Efforts such as the People's Climate March Chicago Phone Banks continue
to drive interest throughout Chicago and across all of Illinois. Participating
organizations such as several NoDAPL efforts are putting the full force of their
grass roots efforts behind this march. The effort and resource expenditures being
placed behind this demonstration giving it the potential for a high payoff media
event.
https://www.facebook.com/events/397261833981670/
https://www.facebook.com/events/282163125540949/
d. CA panel discussion as an effort to maintain the “activist narrative” of the “Water
Protectors” will be held on 13 April 2017, in Chicago. Chi-Nations Youth Council is
sponsoring the event. Chi-Nations Youth Council is a strong supporter of
and her narrative, splitting them away from the Standing Rock Tribal leadership.
This is a continuing effort to maintain a native face to the Anti-DAPL/Water
Protector Movement in the Chicago area.
http://chicagoactivism.org/events/standing-in-solidarity-with-water-protectors-2/
e. Chicago Organizers from outside of the FFW are lending their efforts in support of
the 29 April as well as other future demonstrations in the Chicago Area.
TigerSwan
Prepared for Energy Transfer Partners
15
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
f.
ii.
TigerSwan
Currently, a contact list of activist friendly media persons is being made available
to non-profit organizers. http://www.rachaelpr.com/media-list
Additionally, they are making available a mini pamphlet on what best could be
described as protest/demonstration etiquette.
https://www.afsc.org/sites/afsc.civicactions.net/files/documents/We%20Are%20
All%20We%20Need%20-%20Mini%20Zine.pdf
Past 24 Hours
a. SUNOCO Representative informed DAPL Security to be prepared for Launch
Recovery operations at IL L/R-1 as early as Tuesday, 11 April 2017. Time table to
Launch/Recovery operations at IL L/R-2 dependant on effective operations at L/R1
b. Continue to support Sunoco personnel with operations as needed
c. Continue monitoring and auditing DAPL Security
d. Continue ROW and facility assessment and update running estimate of the
security status and ROW upgrade process
e. Conduct open source monitoring of activist groups
f. Valve site assessments:
IL-10:
Fence: Gaps (6"-10"), Gate: Gaps (10"-16"), Improper
leveling/gravel, Site a mess from construction, ROW dirt not
graded
IL-20:
Fence: Gaps (10-20"), Gate: Gaps (12-24"), improperly
installed, Site a mess from construction, no camera
IL-25:
Fence: Gaps (6-10"), Gate: Front gaps (12-24")
IL-30:
Fence: Gaps (2-4"), Gate: Gaps (6-18"), Needs
leveling/gravel work, Debris remains on site
LR-1
Fence: Gaps (6-10"), Gate: Gaps (4-6"),12’ Gate instead of
the required 24’ gate, Piles of stone and excess dirt, Debris
strewn throughout the facility, mats still down in ROW
100M East of site. CAT 299D Skid Steer and flanges staged
to left of front access gate Approx 30M from hardball road
IL-40:
Fence: Gaps (8-10"), Gate: Gaps (8-10"), Needs
leveling/gravel work especially in corner, tires left piled up
outside of fence, needs No Trespassing sign near Pedestrian
gate. There are no visible signs on east side of fence
IL-60
Fence: Gaps (4-6“), Gate: Gaps (8-10“), Needs
gravel/leveling, no sign near pedestrian gate, no camera
IL-70
Prepared for Energy Transfer Partners
16
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
f.
ii.
TigerSwan
Currently, a contact list of activist friendly media persons is being made available
to non-profit organizers. http://www.rachaelpr.com/media-list
Additionally, they are making available a mini pamphlet on what best could be
described as protest/demonstration etiquette.
https://www.afsc.org/sites/afsc.civicactions.net/files/documents/We%20Are%20
All%20We%20Need%20-%20Mini%20Zine.pdf
Past 24 Hours
a. SUNOCO Representative informed DAPL Security to be prepared for Launch
Recovery operations at IL L/R-1 as early as Tuesday, 11 April 2017. Time table to
Launch/Recovery operations at IL L/R-2 dependant on effective operations at L/R1
b. Continue to support Sunoco personnel with operations as needed
c. Continue monitoring and auditing DAPL Security
d. Continue ROW and facility assessment and update running estimate of the
security status and ROW upgrade process
e. Conduct open source monitoring of activist groups
f. Valve site assessments:
IL-10:
Fence: Gaps (6"-10"), Gate: Gaps (10"-16"), Improper
leveling/gravel, Site a mess from construction, ROW dirt not
graded
IL-20:
Fence: Gaps (10-20"), Gate: Gaps (12-24"), improperly
installed, Site a mess from construction, no camera
IL-25:
Fence: Gaps (6-10"), Gate: Front gaps (12-24")
IL-30:
Fence: Gaps (2-4"), Gate: Gaps (6-18"), Needs
leveling/gravel work, Debris remains on site
LR-1
Fence: Gaps (6-10"), Gate: Gaps (4-6"),12’ Gate instead of
the required 24’ gate, Piles of stone and excess dirt, Debris
strewn throughout the facility, mats still down in ROW
100M East of site. CAT 299D Skid Steer and flanges staged
to left of front access gate Approx 30M from hardball road
IL-40:
Fence: Gaps (8-10"), Gate: Gaps (8-10"), Needs
leveling/gravel work especially in corner, tires left piled up
outside of fence, needs No Trespassing sign near Pedestrian
gate. There are no visible signs on east side of fence
IL-60
Fence: Gaps (4-6“), Gate: Gaps (8-10“), Needs
gravel/leveling, no sign near pedestrian gate, no camera
IL-70
Prepared for Energy Transfer Partners
16
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Fence: Gaps (6-10", Gate: Gaps (10-14"), Pipes not painted,
Site a mess from construction and leftover materials, no
camera, no sign near pedestrian gate
IL-80:
Fence: Gaps (4-6"), Gate: Gaps (14-18"), Pipe not painted,
Needs gravel/leveling work, Needs No Trespassing sign at
vehicle access gates, needs No Trespassing sign at
pedestrian gate
IL-85:
Fence: gaps (8-10"), Gate: gaps (12-14"), Pipe not painted,
needs gravel/leveling work, Flooded partially, Incomplete
electrical, no signs at vehicle access gates, no sign at
pedestrian gate
IL-90:
Fence: gaps (8-10"), Gate: gaps (8-10"), Pipe not painted,
Need gravel/leveling work, Incomplete electrical, missing
game camera, no signs on vehicle access gates, no sign on
pedestrian gate
IL-100:
Fence: Gaps (10-12"), Gate Gaps (6-8"), Pipe not painted,
Corner needs, leveling/gravel, missing game camera,
trench from power service pole needs to be filled in and
leveled out, black plastic liner from valve site lying in ditch
50M N of site, no signs on vehicle access gates, no sign on
pedestrian gate
IL-105:
Fence: gaps (4-6"), Gate: gaps (12-14"), Pipe not painted,
missing game camera, no signs on vehicle access gate, no
sign on pedestrian gate
IL-110:
Gate: Gaps (14"-16"), Fence: Gaps (6"-10", Pipe not
painted, Massive erosion of adjacent SE hill
IL-120:
Fence: Gaps (4-6"), Gate: Gaps (8-12",, Pipe not painted
IL-150:
Fence: Gaps (6-10"), Gate: Front gaps (4-6"), Back gaps (610"), Pipe not painted, does not have No Trespassing signs
on any fence or gate
IL-160:
Fence: Gaps (6-8"), Gate: Gaps (8-12"), Pipe not painted,
Electrical incomplete
TigerSwan
Prepared for Energy Transfer Partners
17
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
Fence: Gaps (6-10", Gate: Gaps (10-14"), Pipes not painted,
Site a mess from construction and leftover materials, no
camera, no sign near pedestrian gate
IL-80:
Fence: Gaps (4-6"), Gate: Gaps (14-18"), Pipe not painted,
Needs gravel/leveling work, Needs No Trespassing sign at
vehicle access gates, needs No Trespassing sign at
pedestrian gate
IL-85:
Fence: gaps (8-10"), Gate: gaps (12-14"), Pipe not painted,
needs gravel/leveling work, Flooded partially, Incomplete
electrical, no signs at vehicle access gates, no sign at
pedestrian gate
IL-90:
Fence: gaps (8-10"), Gate: gaps (8-10"), Pipe not painted,
Need gravel/leveling work, Incomplete electrical, missing
game camera, no signs on vehicle access gates, no sign on
pedestrian gate
IL-100:
Fence: Gaps (10-12"), Gate Gaps (6-8"), Pipe not painted,
Corner needs, leveling/gravel, missing game camera,
trench from power service pole needs to be filled in and
leveled out, black plastic liner from valve site lying in ditch
50M N of site, no signs on vehicle access gates, no sign on
pedestrian gate
IL-105:
Fence: gaps (4-6"), Gate: gaps (12-14"), Pipe not painted,
missing game camera, no signs on vehicle access gate, no
sign on pedestrian gate
IL-110:
Gate: Gaps (14"-16"), Fence: Gaps (6"-10", Pipe not
painted, Massive erosion of adjacent SE hill
IL-120:
Fence: Gaps (4-6"), Gate: Gaps (8-12",, Pipe not painted
IL-150:
Fence: Gaps (6-10"), Gate: Front gaps (4-6"), Back gaps (610"), Pipe not painted, does not have No Trespassing signs
on any fence or gate
IL-160:
Fence: Gaps (6-8"), Gate: Gaps (8-12"), Pipe not painted,
Electrical incomplete
TigerSwan
Prepared for Energy Transfer Partners
17
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
IL-180
Fence: Gaps (6-8“), Gate: Gaps (6-8“), Pipe not painted,
does not have No Trespassing sign on any fence or gate
IL LR2
Fence: Gaps (6-10"), Gate: Gaps (4-6"), Pipes not painted,
game camera installed, corner near housing unit needs
leveling and gravel
IL-190:
Fence: Gaps (6-8"), Gate: Gaps (6-10"), Pipe not painted,
corner near housing unit needs leveling and gravel, game
camera installed
IL-200:
Fence: gaps (2-4"), Gate: gaps (4-6"), Pipe not painted,
game camera installed
IL-205:
Fence: gaps (2-4"), Gate: gaps (8-10"), Pipe not painted,
corner near housing unit needs leveling and gravel, game
camera installed
IL-210:
Fence: gaps (1-2"), Gate: gaps (6-8"), Pipe not painted,
corner near housing unit needs leveling and gravel, game
camera installed, new ditch dug out in site near pipe
(7April)
IL-215:
Fence: Gaps (1-2"), Gate Gaps (4-6"), Pipe not painted,
corner near housing unit needs leveling and gravel, game
camera installed
IL-220:
Fence: gaps (2-4"), Gate: gaps (8-10"), Pipe not painted,
Access road flooded (crew onsite 7 April to assess fix),
corner near housing unit needs leveling and gravel, game
camera installed
IL-230:
Fence: gaps (1-2"), Gate: gaps (4-8"), Ground needs more
gravel/leveling, mild flooding on site, game camera installed
IL-240:
Fence: gaps (1" max), Gate: gaps (4-8"), game camera
installed
IL-245:
Fence: gaps (1-2"), Gate: gaps (4-6"), Leveling and gravel
improved, Construction materials, cluttering site remain,
game camera installed
IL-250:
Fence: gaps (2-4"), Gate: gaps (4-8"), game camera installed
TigerSwan
Prepared for Energy Transfer Partners
18
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
IL-180
Fence: Gaps (6-8“), Gate: Gaps (6-8“), Pipe not painted,
does not have No Trespassing sign on any fence or gate
IL LR2
Fence: Gaps (6-10"), Gate: Gaps (4-6"), Pipes not painted,
game camera installed, corner near housing unit needs
leveling and gravel
IL-190:
Fence: Gaps (6-8"), Gate: Gaps (6-10"), Pipe not painted,
corner near housing unit needs leveling and gravel, game
camera installed
IL-200:
Fence: gaps (2-4"), Gate: gaps (4-6"), Pipe not painted,
game camera installed
IL-205:
Fence: gaps (2-4"), Gate: gaps (8-10"), Pipe not painted,
corner near housing unit needs leveling and gravel, game
camera installed
IL-210:
Fence: gaps (1-2"), Gate: gaps (6-8"), Pipe not painted,
corner near housing unit needs leveling and gravel, game
camera installed, new ditch dug out in site near pipe
(7April)
IL-215:
Fence: Gaps (1-2"), Gate Gaps (4-6"), Pipe not painted,
corner near housing unit needs leveling and gravel, game
camera installed
IL-220:
Fence: gaps (2-4"), Gate: gaps (8-10"), Pipe not painted,
Access road flooded (crew onsite 7 April to assess fix),
corner near housing unit needs leveling and gravel, game
camera installed
IL-230:
Fence: gaps (1-2"), Gate: gaps (4-8"), Ground needs more
gravel/leveling, mild flooding on site, game camera installed
IL-240:
Fence: gaps (1" max), Gate: gaps (4-8"), game camera
installed
IL-245:
Fence: gaps (1-2"), Gate: gaps (4-6"), Leveling and gravel
improved, Construction materials, cluttering site remain,
game camera installed
IL-250:
Fence: gaps (2-4"), Gate: gaps (4-8"), game camera installed
TigerSwan
Prepared for Energy Transfer Partners
18
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
IL-260:
Fence: gaps (1-2"), Gate: gaps (4-6"), electrical incomplete,
game camera installed
IL-280:
Fence: gaps (1"), Gate: gaps (4-6"), game camera installed
IL-285:
Fence: gaps (1-2"), Gate: gaps (4-6"), game camera installed
IL-290
Fence: gaps (1-2"), Gate: gaps (4-6"), game camera installed
IL-300
Fence: gaps (1-2"), Gate: (8-10”), game camera installed, palettes of construction
materials and tires cluttering site, row still nowhere near reclaimed
IL-310:
Fence: gaps (1"), Gate: gaps (6-8"), game camera installed, electrical complete
IL-330:
Fence: gaps (1-2"), Gate: gaps (4-6"), Flooded, Improper gravel/leveling, game
camera installed
IL-340:
Fence: gaps (1"), Gate: gaps (6-8"), game camera installed
IL-350:
Fence: gaps (2-4"), Gate: gaps (6-8"), Palettes of Construction materials on site/
clutter, game camera installed
IL-360:
Fence: gaps (1"), Gate: gaps (6-8"), game camera installed
IL-370:
Fence: gaps (2-4"), Gate: gaps (8-10"), game camera installed
IL-380:
Fence: gaps (1"), Gate: gaps (4-8"), Electrical completed, game camera installed
Next 24 Hours
a. Continue to support Sunoco personnel with operations as needed
b. Continue ROW and facility assessment and update running estimate of the
security status and ROW upgrade process
c. Conduct open source monitoring of activist groups
TigerSwan
Prepared for Energy Transfer Partners
19
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
IL-260:
Fence: gaps (1-2"), Gate: gaps (4-6"), electrical incomplete,
game camera installed
IL-280:
Fence: gaps (1"), Gate: gaps (4-6"), game camera installed
IL-285:
Fence: gaps (1-2"), Gate: gaps (4-6"), game camera installed
IL-290
Fence: gaps (1-2"), Gate: gaps (4-6"), game camera installed
IL-300
Fence: gaps (1-2"), Gate: (8-10”), game camera installed, palettes of construction
materials and tires cluttering site, row still nowhere near reclaimed
IL-310:
Fence: gaps (1"), Gate: gaps (6-8"), game camera installed, electrical complete
IL-330:
Fence: gaps (1-2"), Gate: gaps (4-6"), Flooded, Improper gravel/leveling, game
camera installed
IL-340:
Fence: gaps (1"), Gate: gaps (6-8"), game camera installed
IL-350:
Fence: gaps (2-4"), Gate: gaps (6-8"), Palettes of Construction materials on site/
clutter, game camera installed
IL-360:
Fence: gaps (1"), Gate: gaps (6-8"), game camera installed
IL-370:
Fence: gaps (2-4"), Gate: gaps (8-10"), game camera installed
IL-380:
Fence: gaps (1"), Gate: gaps (4-8"), Electrical completed, game camera installed
Next 24 Hours
a. Continue to support Sunoco personnel with operations as needed
b. Continue ROW and facility assessment and update running estimate of the
security status and ROW upgrade process
c. Conduct open source monitoring of activist groups
TigerSwan
Prepared for Energy Transfer Partners
19