BLARNEY report Apr 2013

Nov. 16 2016 — 7:36p.m.

/7
1/7

TOP SECRET//COMINT//REL TO USA, FVEY (Report generated on:4/23/2013 7:00:17AM ) Blarney-40-12 Work in Progress ECP Lead: Title of Change: DNI Processing of RINGBILL Access Site(s): TITAN POINTE : Project(s): No Project(s) Entered System(s): VISIONQUEST : SubSystem(s): No Subsystem(s) Entered Description of Change: This is a partially historical ECP to track efforts performed for processing the DNI portion of RINGBILL. The initial processing of RINGBILL will be performed on our legacy WC2/XKS systems (using Trireme for VoIP & VTC traffic). Once we stand up SKIDROWE, the processing will transfer to that solution so we will need to be cognizant of any and all requirements that should be defined for the SKIDROWE team to enable our solution. Because we are initially using our legacy systems there will be extra work required to configure them and the network to be capable of higher than normal throughput. There will also be work to determine what kind of filtering is required so that we don't overwhelm our PINWALE partitions. Finally, it is already apparent that further work will be required on the VoIP processing to associate signaling with media cuts. Once that is complete we will be able to look into filtering based on dialing patterns. Reason for Change: Mission Impact: Additional Info: Last CCB Entry: We now have access to the RINGBILL DNI and rather than waiting until the June/July timeframe to use the new solution for processing, we have developed an interim solution for processing the high data rates on existing architecture. These efforts are an interim solution to process the RINGBILL signal months earlier than we orginally planned. Resources will have to be prioritized against other efforts. 04/10/13 15:44:43 09 Apr CCB - ECP status reviewed Work Task ID: WT00010435 ECP Number: Blarney-40-12 Status: Reassigned Description: Update Baseline - DNI Processing of RINGBILL Access Life Cycle Phase: Last Log Entry: Assigned To: --- 04/11/13 08:31:14 --- 4/11/13 - NTR Work Task ID: WT00010584 ECP Number: Blarney-40-12 Status: Completed Description: Enable DNI Processing of RINGBILL through ng WC2 architecture Life Cycle Phase: Last Log Entry: Assigned To: --- 04/11/13 08:31:49 --- 4/11/13 - NTR Page 23 of 51 TOP SECRET//COMINT//REL TO USA, FVEY

TOP SECRET//COMINT//REL TO USA, FVEY (Report generated on:4/23/2013 7:00:17AM ) Work Task ID: WT00010585 ECP Number: Blarney-40-12 Status: Completed Description: Enable VoIP processing of RINGBILL desk es Life Cycle Phase: Last Log Entry: Assigned To: --- 04/11/13 08:32:25 --- 4/11/13 - NTR Work Task ID: WT00010586 ECP Number: Blarney-40-12 Status: Being Worked Description: Deploy SKIDROWE solution for RINGBILL DNI Processing Life Cycle Phase: Assigned To: Last Log Entry: --- 04/03/13 15:51:25 --- XKS has been loaded on the two SR systems at TP. The TW release is expected by the end of April, though this may push out again. There are some planned RPM updates for XKS that will be installed next week. Work Task ID: WT00010586-1 ECP Number: Blarney-40-12 Status: Completed Description: Define RINGBILL Hardware Requirements Life Cycle Phase: Last Log Entry: Assigned To: --- 04/11/13 08:33:02 --- 4/11/13 - NTR Work Task ID: WT00010586-2 ECP Number: Blarney-40-12 Status: Completed Description: Order Skidrow Equipment Life Cycle Phase: Last Log Entry: Assigned To: --- 08/22/12 13:56:48 --- Order equipment for the RINGBILL SKIDROWE system Work Task ID: WT00010586-3 ECP Number: Blarney-40-12 Status: Completed Description: Order Additional Parts Life Cycle Phase: Assigned To: Last Log Entry: --- 01/16/13 09:33:07 --- All equipment associated with the RINGBILL SKIDROWE has been ordered and received. Closing worktask. Work Task ID: WT00010586-4 ECP Number: Blarney-40-12 Status: Completed Description: Recieve Ordered Equipment Life Cycle Phase: Last Log Entry: Assigned To: --- 08/22/12 14:03:13 --- Receive equipment that was ordered. Page 24 of 51 TOP SECRET//COMINT//REL TO USA, FVEY

TOP SECRET//COMINT//REL TO USA, FVEY (Report generated on:4/23/2013 7:00:17AM ) Work Task ID: WT00010586-5 ECP Number: Blarney-40-12 Status: Being Worked Description: Stand up Test System Life Cycle Phase: Assigned To: Last Log Entry: --- 04/03/13 15:52:20 --- XKS has been upgraded to 1.5.11 and we have begun to test, though we need to install some patches before we can continue. We are still waiting for TW software. Work Task ID: WT00010586-6 ECP Number: Blarney-40-12 Status: Completed Description: Test the RINGBILL SKIDROWE Servers. Life Cycle Phase: Assigned To: Last Log Entry: --- 12/05/12 15:57:17 --- Servers have been installed at site and powered on. Closing ticket. Work Task ID: WT00010586-7 ECP Number: Blarney-40-12 Status: Completed Description: Install 10G NICs in each RINGBILL SKIDROWE r Life Cycle Phase: Assigned To: --- 12/05/12 16:00:07 --- Completed. Last Log Entry: Work Task ID: WT00010586-8 ECP Number: Blarney-40-12 Status: Completed Description: Design Site Plan Life Cycle Phase: Assigned To: Last Log Entry: --- 01/16/13 09:39:48 --- Rack elevations and network plan has been developed an has been incorporated into site documentation. Closing ticket. Work Task ID: WT00010586-9 ECP Number: Blarney-40-12 Status: Completed Description: Transport Equipment to Site Life Cycle Phase: Assigned To: --- 02/21/13 14:50:16 --- Equipment has been shipped to site and installed. Closing Last Log Entry: ticket. Work Task ID: WT00010586-10 ECP Number: Blarney-40-12 Status: Assigned Description: Load System and Test Functionality Life Cycle Phase: Last Log Entry: Assigned To: --- 04/11/13 08:34:12 --- 4/11/2013 - NTR Page 25 of 51 TOP SECRET//COMINT//REL TO USA, FVEY

TOP SECRET//COMINT//REL TO USA, FVEY (Report generated on:4/23/2013 7:00:17AM ) Work Task ID: WT00010586-11 ECP Number: Blarney-40-12 Status: Completed Description: Duplicate RINGBILL Signal to the SKIDROWE m Life Cycle Phase: Assigned To: Last Log Entry: --- 02/21/13 14:00:40 --- Signal has been duplicated with a 30/70 splitter. When we're ready to start processing we'll have to see if the light levels are good enough. also has a 50/50 splitter at site that we can try if need be. Marking as complete and will reopen if further work needs to be performed. Work Task ID: WT00010586-12 ECP Number: Blarney-40-12 Status: Assigned Description: Declare System IOC Life Cycle Phase: Last Log Entry: Assigned To: --- 04/11/13 08:35:55 --- NTR Work Task ID: WT00010586-13 ECP Number: Blarney-40-12 Status: Assigned Description: Decommission WCT05 Life Cycle Phase: Last Log Entry: Assigned To: --- 04/11/13 08:36:10 --- NTR Work Task ID: WT00010586-14 ECP Number: Blarney-40-12 Status: Completed Description: Perform Site Survey Life Cycle Phase: Last Log Entry: Assigned To: --- 08/22/12 14:24:44 --- Completed 6/26/12 Work Task ID: WT00010586-15 ECP Number: Blarney-40-12 Status: Completed Description: Conduct System Design Review Life Cycle Phase: Last Log Entry: Assigned To: --- 01/16/13 09:35:03 --- This was completed as part of the ERB. Closing ticket. Work Task ID: WT00010586-16 ECP Number: Blarney-40-12 Status: Completed Description: Obtain ETS TD Approval of System Design Life Cycle Phase: Last Log Entry: Assigned To: --- 01/16/13 09:35:34 --- Completed during the ERB for SKIDROWE. Closing ticket. Page 26 of 51 TOP SECRET//COMINT//REL TO USA, FVEY

TOP SECRET//COMINT//REL TO USA, FVEY (Report generated on:4/23/2013 7:00:17AM ) Work Task ID: WT00010586-17 ECP Number: Blarney-40-12 Status: Completed Description: ERB Processing Recommendation Matrix Life Cycle Phase: Assigned To: --- 01/16/13 09:36:08 --- ERB presentation was completed and approved. Closing Last Log Entry: ticket. Work Task ID: WT00010586-18 ECP Number: Blarney-40-12 Status: Completed Description: Schedule/Conduct Depolyment Readiness w (DRR) Life Cycle Phase: Last Log Entry: Assigned To: --- 01/16/13 09:36:39 --- This was completed as part of the ERB. Closing ticket. Page 27 of 51 TOP SECRET//COMINT//REL TO USA, FVEY

TOP SECRETIICOMINTIIREL To USA, FVEY (Report generated 7 no 17AM Blarney-554 2 Work ln Progress ECP Lea - Title at Change: Deployment ot TURTLEPOWER system rn v0 envrronment No Sim(s) Entered From No Projectts) Entered System No Enmred WE EDP encompass CES to stand up and lorward deploy a TURTLEPOWER system tor purpose VolP. lnstallatron oocur - followed by deployment to TP and agarnsl the data llsuocesstul we could turn rnto an operatronal system and work through the detarls tor and numper nonnalrzatron. WE The prrmary purpose of system he to determrne volP Ihaugh other Ilker pe examrned as well Trlreme reourres some development to support desk phone conversatrons ot the data and rt has peen conveyed has the already. We are proposrng deploylng a TURTLEPOWER system to test and potentrally proyrde a solutron to the to TOPIs rn a compressed trmetrame (compantvely to the Trlreme solutron. also provrdes ELARNEY an opportunrty to help TURTLEPOWER develop therr py ustng potentrally unlque data lound rn the BLARNEY envrronments. Any derrved enhancements to TURTLEPOWER help the agency as a whole Mission lmp_acl: eflan potentrally allow us to delrver votce cuts to the TOPI sooner than tor the solutron lt also allows us to make sure we're uSlng the pest solutron lorthe lab he worked ln accordance to prrontes as set by the BAT branch so other not pe negatryely rmpacted. Additional Last COB Emu: 04/1011 reyrewed. Work Task ID: WTOOD10899 zap Number: Blarney-5512 Statu New Update Easelrne - Deployment o1 LEFOWER system rn VQ enylronment Life cE/e Phase: Assigned To: Last Log Ema: Work Task ID: WT00010944 zap Number: Blarney-5512 Status: Completed Descn'gtian: lnstallatron and configuratron o1 lmtlal TF server Life Phase: Assigned To: - - 12/05/12 15.50 37 System has been deployed: configured: and rs operatronal data A DMR was and approved pnorto galng llve operatronal on Noyemper1sth. Last Log Ema: Page 29 of 51 TOP SECRETIICOMINTIIREL TO USA, FVEY

TOP SECRET//COMINT//REL TO USA, FVEY (Report generated on:4/23/2013 7:00:17AM ) Work Task ID: WT00010945 ECP Number: Blarney-55-12 Status: Being Worked Description: Analysis of Turtlepower Proceessing in BLARNEY Life Cycle Phase: Last Log Entry: Assigned To: --- 04/03/13 15:49:37 --- Test data has been provided to PE to further develop against non SKINNY protocols in an effort to perform processing against a broader scope of data. We are currently waiting for their feedback on progress and what it would take to improve the system performance. Page 30 of 51 TOP SECRET//COMINT//REL TO USA, FVEY