BLARNEY report Apr 2013
Nov. 16, 2016
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Blarney-40-12
Work in Progress
ECP Lead:
Title of Change:
DNI Processing of RINGBILL Access
Site(s):
TITAN POINTE :
Project(s):
No Project(s) Entered
System(s):
VISIONQUEST :
SubSystem(s):
No Subsystem(s) Entered
Description of Change:
This is a partially historical ECP to track efforts performed for processing the
DNI portion of RINGBILL. The initial processing of RINGBILL will be
performed on our legacy WC2/XKS systems (using Trireme for VoIP & VTC
traffic). Once we stand up SKIDROWE, the processing will transfer to that
solution so we will need to be cognizant of any and all requirements that should
be defined for the SKIDROWE team to enable our solution.
Because we are initially using our legacy systems there will be extra work
required to configure them and the network to be capable of higher than
normal throughput. There will also be work to determine what kind of filtering
is required so that we don't overwhelm our PINWALE partitions. Finally, it is
already apparent that further work will be required on the VoIP processing to
associate signaling with media cuts. Once that is complete we will be able to
look into filtering based on dialing patterns.
Reason for Change:
Mission Impact:
Additional Info:
Last CCB Entry:
We now have access to the RINGBILL DNI and rather than waiting until the
June/July timeframe to use the new solution for processing, we have
developed an interim solution for processing the high data rates on existing
architecture.
These efforts are an interim solution to process the RINGBILL signal months
earlier than we orginally planned. Resources will have to be prioritized against
other efforts.
04/10/13 15:44:43
09 Apr CCB - ECP status reviewed
Work Task ID:
WT00010435
ECP Number:
Blarney-40-12
Status:
Reassigned
Description:
Update Baseline - DNI Processing of RINGBILL
Access
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:31:14 --- 4/11/13 - NTR
Work Task ID:
WT00010584
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Enable DNI Processing of RINGBILL through
ng WC2 architecture
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:31:49 --- 4/11/13 - NTR
Page 23 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Blarney-40-12
Work in Progress
ECP Lead:
Title of Change:
DNI Processing of RINGBILL Access
Site(s):
TITAN POINTE :
Project(s):
No Project(s) Entered
System(s):
VISIONQUEST :
SubSystem(s):
No Subsystem(s) Entered
Description of Change:
This is a partially historical ECP to track efforts performed for processing the
DNI portion of RINGBILL. The initial processing of RINGBILL will be
performed on our legacy WC2/XKS systems (using Trireme for VoIP & VTC
traffic). Once we stand up SKIDROWE, the processing will transfer to that
solution so we will need to be cognizant of any and all requirements that should
be defined for the SKIDROWE team to enable our solution.
Because we are initially using our legacy systems there will be extra work
required to configure them and the network to be capable of higher than
normal throughput. There will also be work to determine what kind of filtering
is required so that we don't overwhelm our PINWALE partitions. Finally, it is
already apparent that further work will be required on the VoIP processing to
associate signaling with media cuts. Once that is complete we will be able to
look into filtering based on dialing patterns.
Reason for Change:
Mission Impact:
Additional Info:
Last CCB Entry:
We now have access to the RINGBILL DNI and rather than waiting until the
June/July timeframe to use the new solution for processing, we have
developed an interim solution for processing the high data rates on existing
architecture.
These efforts are an interim solution to process the RINGBILL signal months
earlier than we orginally planned. Resources will have to be prioritized against
other efforts.
04/10/13 15:44:43
09 Apr CCB - ECP status reviewed
Work Task ID:
WT00010435
ECP Number:
Blarney-40-12
Status:
Reassigned
Description:
Update Baseline - DNI Processing of RINGBILL
Access
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:31:14 --- 4/11/13 - NTR
Work Task ID:
WT00010584
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Enable DNI Processing of RINGBILL through
ng WC2 architecture
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:31:49 --- 4/11/13 - NTR
Page 23 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010585
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Enable VoIP processing of RINGBILL desk
es
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:32:25 --- 4/11/13 - NTR
Work Task ID:
WT00010586
ECP Number:
Blarney-40-12
Status:
Being Worked
Description:
Deploy SKIDROWE solution for RINGBILL DNI
Processing
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 04/03/13 15:51:25 --- XKS has been loaded on the two SR systems at TP. The
TW release is expected by the end of April, though this may push out again. There are
some planned RPM updates for XKS that will be installed next week.
Work Task ID:
WT00010586-1
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Define RINGBILL Hardware Requirements
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:33:02 --- 4/11/13 - NTR
Work Task ID:
WT00010586-2
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Order Skidrow Equipment
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 08/22/12 13:56:48 --- Order equipment for the RINGBILL SKIDROWE system
Work Task ID:
WT00010586-3
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Order Additional Parts
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 01/16/13 09:33:07 --- All equipment associated with the RINGBILL SKIDROWE
has been ordered and received. Closing worktask.
Work Task ID:
WT00010586-4
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Recieve Ordered Equipment
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 08/22/12 14:03:13 --- Receive equipment that was ordered.
Page 24 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010585
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Enable VoIP processing of RINGBILL desk
es
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:32:25 --- 4/11/13 - NTR
Work Task ID:
WT00010586
ECP Number:
Blarney-40-12
Status:
Being Worked
Description:
Deploy SKIDROWE solution for RINGBILL DNI
Processing
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 04/03/13 15:51:25 --- XKS has been loaded on the two SR systems at TP. The
TW release is expected by the end of April, though this may push out again. There are
some planned RPM updates for XKS that will be installed next week.
Work Task ID:
WT00010586-1
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Define RINGBILL Hardware Requirements
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:33:02 --- 4/11/13 - NTR
Work Task ID:
WT00010586-2
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Order Skidrow Equipment
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 08/22/12 13:56:48 --- Order equipment for the RINGBILL SKIDROWE system
Work Task ID:
WT00010586-3
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Order Additional Parts
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 01/16/13 09:33:07 --- All equipment associated with the RINGBILL SKIDROWE
has been ordered and received. Closing worktask.
Work Task ID:
WT00010586-4
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Recieve Ordered Equipment
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 08/22/12 14:03:13 --- Receive equipment that was ordered.
Page 24 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010586-5
ECP Number:
Blarney-40-12
Status:
Being Worked
Description:
Stand up Test System
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 04/03/13 15:52:20 --- XKS has been upgraded to 1.5.11 and we have begun to
test, though we need to install some patches before we can continue. We are still waiting
for TW software.
Work Task ID:
WT00010586-6
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Test the RINGBILL SKIDROWE Servers.
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 12/05/12 15:57:17 --- Servers have been installed at site and powered on.
Closing ticket.
Work Task ID:
WT00010586-7
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Install 10G NICs in each RINGBILL SKIDROWE
r
Life Cycle Phase:
Assigned To:
--- 12/05/12 16:00:07 --- Completed.
Last Log Entry:
Work Task ID:
WT00010586-8
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Design Site Plan
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 01/16/13 09:39:48 --- Rack elevations and network plan has been developed an
has been incorporated into site documentation. Closing ticket.
Work Task ID:
WT00010586-9
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Transport Equipment to Site
Life Cycle Phase:
Assigned To:
--- 02/21/13 14:50:16 --- Equipment has been shipped to site and installed. Closing
Last Log Entry:
ticket.
Work Task ID:
WT00010586-10
ECP Number:
Blarney-40-12
Status:
Assigned
Description:
Load System and Test Functionality
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:34:12 --- 4/11/2013 - NTR
Page 25 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010586-5
ECP Number:
Blarney-40-12
Status:
Being Worked
Description:
Stand up Test System
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 04/03/13 15:52:20 --- XKS has been upgraded to 1.5.11 and we have begun to
test, though we need to install some patches before we can continue. We are still waiting
for TW software.
Work Task ID:
WT00010586-6
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Test the RINGBILL SKIDROWE Servers.
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 12/05/12 15:57:17 --- Servers have been installed at site and powered on.
Closing ticket.
Work Task ID:
WT00010586-7
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Install 10G NICs in each RINGBILL SKIDROWE
r
Life Cycle Phase:
Assigned To:
--- 12/05/12 16:00:07 --- Completed.
Last Log Entry:
Work Task ID:
WT00010586-8
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Design Site Plan
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 01/16/13 09:39:48 --- Rack elevations and network plan has been developed an
has been incorporated into site documentation. Closing ticket.
Work Task ID:
WT00010586-9
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Transport Equipment to Site
Life Cycle Phase:
Assigned To:
--- 02/21/13 14:50:16 --- Equipment has been shipped to site and installed. Closing
Last Log Entry:
ticket.
Work Task ID:
WT00010586-10
ECP Number:
Blarney-40-12
Status:
Assigned
Description:
Load System and Test Functionality
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:34:12 --- 4/11/2013 - NTR
Page 25 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010586-11
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Duplicate RINGBILL Signal to the SKIDROWE
m
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 02/21/13 14:00:40 --- Signal has been duplicated with a 30/70 splitter. When
we're ready to start processing we'll have to see if the light levels are good enough.
also has a 50/50 splitter at site that we can try if need be. Marking as complete and will
reopen if further work needs to be performed.
Work Task ID:
WT00010586-12
ECP Number:
Blarney-40-12
Status:
Assigned
Description:
Declare System IOC
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:35:55 --- NTR
Work Task ID:
WT00010586-13
ECP Number:
Blarney-40-12
Status:
Assigned
Description:
Decommission WCT05
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:36:10 --- NTR
Work Task ID:
WT00010586-14
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Perform Site Survey
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 08/22/12 14:24:44 --- Completed 6/26/12
Work Task ID:
WT00010586-15
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Conduct System Design Review
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 01/16/13 09:35:03 --- This was completed as part of the ERB. Closing ticket.
Work Task ID:
WT00010586-16
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Obtain ETS TD Approval of System Design
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 01/16/13 09:35:34 --- Completed during the ERB for SKIDROWE. Closing ticket.
Page 26 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010586-11
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Duplicate RINGBILL Signal to the SKIDROWE
m
Life Cycle Phase:
Assigned To:
Last Log Entry:
--- 02/21/13 14:00:40 --- Signal has been duplicated with a 30/70 splitter. When
we're ready to start processing we'll have to see if the light levels are good enough.
also has a 50/50 splitter at site that we can try if need be. Marking as complete and will
reopen if further work needs to be performed.
Work Task ID:
WT00010586-12
ECP Number:
Blarney-40-12
Status:
Assigned
Description:
Declare System IOC
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:35:55 --- NTR
Work Task ID:
WT00010586-13
ECP Number:
Blarney-40-12
Status:
Assigned
Description:
Decommission WCT05
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/11/13 08:36:10 --- NTR
Work Task ID:
WT00010586-14
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Perform Site Survey
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 08/22/12 14:24:44 --- Completed 6/26/12
Work Task ID:
WT00010586-15
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Conduct System Design Review
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 01/16/13 09:35:03 --- This was completed as part of the ERB. Closing ticket.
Work Task ID:
WT00010586-16
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Obtain ETS TD Approval of System Design
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 01/16/13 09:35:34 --- Completed during the ERB for SKIDROWE. Closing ticket.
Page 26 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010586-17
ECP Number:
Blarney-40-12
Status:
Completed
Description:
ERB Processing Recommendation Matrix
Life Cycle Phase:
Assigned To:
--- 01/16/13 09:36:08 --- ERB presentation was completed and approved. Closing
Last Log Entry:
ticket.
Work Task ID:
WT00010586-18
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Schedule/Conduct Depolyment Readiness
w (DRR)
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 01/16/13 09:36:39 --- This was completed as part of the ERB. Closing ticket.
Page 27 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010586-17
ECP Number:
Blarney-40-12
Status:
Completed
Description:
ERB Processing Recommendation Matrix
Life Cycle Phase:
Assigned To:
--- 01/16/13 09:36:08 --- ERB presentation was completed and approved. Closing
Last Log Entry:
ticket.
Work Task ID:
WT00010586-18
ECP Number:
Blarney-40-12
Status:
Completed
Description:
Schedule/Conduct Depolyment Readiness
w (DRR)
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 01/16/13 09:36:39 --- This was completed as part of the ERB. Closing ticket.
Page 27 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRETIICOMINTIIREL To USA, FVEY
(Report generated 7 no 17AM
Blarney-554 2 Work ln Progress ECP Lea -
Title at Change: Deployment ot TURTLEPOWER system rn v0 envrronment
No Sim(s) Entered From No Projectts) Entered
System No Enmred
WE EDP encompass CES to stand up and
lorward deploy a TURTLEPOWER system tor purpose VolP.
lnstallatron oocur - followed by deployment to TP and agarnsl
the data llsuocesstul we could turn rnto an operatronal system
and work through the detarls tor and numper nonnalrzatron.
WE The prrmary purpose of system he to determrne volP
Ihaugh other Ilker pe examrned as well Trlreme
reourres some development to support desk phone conversatrons ot the
data and rt has peen conveyed has the
already. We are proposrng deploylng a TURTLEPOWER system to
test and potentrally proyrde a solutron to
the to TOPIs rn a compressed trmetrame (compantvely to the Trlreme solutron.
also provrdes ELARNEY an opportunrty to help TURTLEPOWER develop
therr py ustng potentrally unlque data lound rn the BLARNEY
envrronments. Any derrved enhancements to TURTLEPOWER help the
agency as a whole
Mission lmp_acl: eflan potentrally allow us to delrver votce cuts to the TOPI
sooner than tor the solutron lt also allows us to make sure
we're uSlng the pest solutron lorthe lab
he worked ln accordance to prrontes as set by the BAT branch so
other not pe negatryely rmpacted.
Additional
Last COB Emu: 04/1011 reyrewed.
Work Task ID: WTOOD10899 zap Number: Blarney-5512
Statu New Update Easelrne - Deployment o1
LEFOWER system rn VQ enylronment
Life cE/e Phase: Assigned To:
Last Log Ema:
Work Task ID: WT00010944 zap Number: Blarney-5512
Status: Completed Descn'gtian: lnstallatron and configuratron o1 lmtlal TF server
Life Phase: Assigned To: -
- 12/05/12 15.50 37 System has been deployed: configured: and rs
operatronal data A DMR was and approved pnorto galng llve operatronal
on Noyemper1sth.
Last Log Ema:
Page 29 of 51
TOP SECRETIICOMINTIIREL TO USA, FVEY
TOP SECRETIICOMINTIIREL To USA, FVEY
(Report generated 7 no 17AM
Blarney-554 2 Work ln Progress ECP Lea -
Title at Change: Deployment ot TURTLEPOWER system rn v0 envrronment
No Sim(s) Entered From No Projectts) Entered
System No Enmred
WE EDP encompass CES to stand up and
lorward deploy a TURTLEPOWER system tor purpose VolP.
lnstallatron oocur - followed by deployment to TP and agarnsl
the data llsuocesstul we could turn rnto an operatronal system
and work through the detarls tor and numper nonnalrzatron.
WE The prrmary purpose of system he to determrne volP
Ihaugh other Ilker pe examrned as well Trlreme
reourres some development to support desk phone conversatrons ot the
data and rt has peen conveyed has the
already. We are proposrng deploylng a TURTLEPOWER system to
test and potentrally proyrde a solutron to
the to TOPIs rn a compressed trmetrame (compantvely to the Trlreme solutron.
also provrdes ELARNEY an opportunrty to help TURTLEPOWER develop
therr py ustng potentrally unlque data lound rn the BLARNEY
envrronments. Any derrved enhancements to TURTLEPOWER help the
agency as a whole
Mission lmp_acl: eflan potentrally allow us to delrver votce cuts to the TOPI
sooner than tor the solutron lt also allows us to make sure
we're uSlng the pest solutron lorthe lab
he worked ln accordance to prrontes as set by the BAT branch so
other not pe negatryely rmpacted.
Additional
Last COB Emu: 04/1011 reyrewed.
Work Task ID: WTOOD10899 zap Number: Blarney-5512
Statu New Update Easelrne - Deployment o1
LEFOWER system rn VQ enylronment
Life cE/e Phase: Assigned To:
Last Log Ema:
Work Task ID: WT00010944 zap Number: Blarney-5512
Status: Completed Descn'gtian: lnstallatron and configuratron o1 lmtlal TF server
Life Phase: Assigned To: -
- 12/05/12 15.50 37 System has been deployed: configured: and rs
operatronal data A DMR was and approved pnorto galng llve operatronal
on Noyemper1sth.
Last Log Ema:
Page 29 of 51
TOP SECRETIICOMINTIIREL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010945
ECP Number:
Blarney-55-12
Status:
Being Worked
Description:
Analysis of Turtlepower Proceessing in
BLARNEY
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/03/13 15:49:37 --- Test data has been provided to PE to further develop
against non SKINNY protocols in an effort to perform processing against a broader scope
of data. We are currently waiting for their feedback on progress and what it would take to
improve the system performance.
Page 30 of 51
TOP SECRET//COMINT//REL TO USA, FVEY
TOP SECRET//COMINT//REL TO USA, FVEY
(Report generated on:4/23/2013 7:00:17AM )
Work Task ID:
WT00010945
ECP Number:
Blarney-55-12
Status:
Being Worked
Description:
Analysis of Turtlepower Proceessing in
BLARNEY
Life Cycle Phase:
Last Log Entry:
Assigned To:
--- 04/03/13 15:49:37 --- Test data has been provided to PE to further develop
against non SKINNY protocols in an effort to perform processing against a broader scope
of data. We are currently waiting for their feedback on progress and what it would take to
improve the system performance.
Page 30 of 51