Bagram - Area 82
-+--+--+--+--+--+--+--+--+--+--+--+-
The Story So Far .....
-+ -- + --- ...- -+ - -+ -- + -
23 June 2010
SECRET
Bagram - Area 82
-+--+--+--+--+--+--+--+--+--+--+--+-
The Story So Far .....
-+ -- + --- ...- -+ - -+ -- + -
23 June 2010
SECRET
Introduction
.
.
.
.
-....-- --.---.-.---
.
.
.
....
-- -'1-"--~---.-.--
. --~- .
.......
.
.
-~----..---
.
.......
-
(GREMIO ASI PM)
~
Technical delivery by IT Services with help from
C&W
~
This is a summary of how we got there, including:
•
•
•
•
2 winters (neither really happened)
5+ external partners
1 minefield with added bornb and
1 toilet block
23 June 2010
SECRET
Introduction
.
.
.
.
-....-- --.---.-.---
.
.
.
....
-- -'1-"--~---.-.--
. --~- .
.......
.
.
-~----..---
.
.......
-
(GREMIO ASI PM)
~
Technical delivery by IT Services with help from
C&W
~
This is a summary of how we got there, including:
•
•
•
•
2 winters (neither really happened)
5+ external partners
1 minefield with added bornb and
1 toilet block
23 June 2010
SECRET
Why did we build this facility?
--+- - --+----+----.--
~
}=.
--+----+----,;,--
--+----+--
--+----+----+--
GCOs wanted access to RT-RG
RT- RG was based at Bag ram Airfield and
effective access required:
• Single satellite hop connectivity
• Requiring A new in th eatre network
• Requiring In-theatre peering with NSA
23 June 2010
SECRET
Why did we build this facility?
--+- - --+----+----.--
~
}=.
--+----+----,;,--
--+----+--
--+----+----+--
GCOs wanted access to RT-RG
RT- RG was based at Bag ram Airfield and
effective access required:
• Single satellite hop connectivity
• Requiring A new in th eatre network
• Requiring In-theatre peering with NSA
23 June 2010
SECRET
Where we started
-+-
--+---+--
.....
-- --+----+----i---+--...--
~
-.....;..-- ........
--+-
Container based solution at Souter
~"Fit a peering point into 1 container (5 racks)
Try to link this all to RT -R G at Bagram
~ Winter was
approaching and
there was a risk of
bad weather /
frozen ground.
'llil
23 June 2010
SECRET
Where we started
-+-
--+---+--
.....
-- --+----+----i---+--...--
~
-.....;..-- ........
--+-
Container based solution at Souter
~"Fit a peering point into 1 container (5 racks)
Try to link this all to RT -R G at Bagram
~ Winter was
approaching and
there was a risk of
bad weather /
frozen ground.
'llil
23 June 2010
SECRET
Area-82 was still just a good idea
-+-
--+---+--
23 June 2010
....-- --t----+----._
SECRET
__ _.___ _.__-.....;...--.........
--+-
Area-82 was still just a good idea
-+-
--+---+--
23 June 2010
....-- --t----+----._
SECRET
__ _.___ _.__-.....;...--.........
--+-
Then came the Minefield
-+-
--+---+--
....-- --t----+----._
__ _.___ _.__ -.....;...-- .........
--+-
~ .. Space
available on Area 82 - if we don't
mind it being in a minefield.
Oh, and by the way - there is a 500lb
unexploded bomb in the middle of it. ....
-.~. Souter not an option
1"..
~
Area-82 becoming
a building site
--~Still in containers
23 June 2010
SECRET
..
Then came the Minefield
-+-
--+---+--
....-- --t----+----._
__ _.___ _.__ -.....;...-- .........
--+-
~ .. Space
available on Area 82 - if we don't
mind it being in a minefield.
Oh, and by the way - there is a 500lb
unexploded bomb in the middle of it. ....
-.~. Souter not an option
1"..
~
Area-82 becoming
a building site
--~Still in containers
23 June 2010
SECRET
..
Then came the data centre move
-+-
~
_.....,....
__ .....,....
__ _.___ ......_.
__ .....,....
___ .,....
__ ......_
__ .......
_ -+--+--+-
RT-RG moving into new data centre so our
plans delayed once more
~"Space available for our racks and plans to
clear the minefield are drawn up
23 June 2010
SECRET
Then came the data centre move
-+-
~
_.....,....
__ .....,....
__ _.___ ......_.
__ .....,....
___ .,....
__ ......_
__ .......
_ -+--+--+-
RT-RG moving into new data centre so our
plans delayed once more
~"Space available for our racks and plans to
clear the minefield are drawn up
23 June 2010
SECRET
Area-82 was also changing fast
-+-
--+---
23 June 2010
........
-- .....
-- --+----+----.;----+----+--
SECRET
_....._
__ -+----+--
Area-82 was also changing fast
-+-
--+---
23 June 2010
........
-- .....
-- --+----+----.;----+----+--
SECRET
_....._
__ -+----+--
"The Minefield is Cleared"
-+\,j ..
--+---+--
.....
-- _....___ _...___ .___ ...._
__ _.__-+--
........
--+-
All we needed was a volunteer to go check
out this rumour
23 June 2010
SECRET
"The Minefield is Cleared"
-+\,j ..
--+---+--
.....
-- _....___ _...___ .___ ...._
__ _.__-+--
........
--+-
All we needed was a volunteer to go check
out this rumour
23 June 2010
SECRET
Then the other guests turned up
-+.-
~
~
~
~
~
~
~
_.....,....
__ ....._.
__ _. ___ .......,
__ .....,....
___ ._ __ ....._
__ ....__ -+.--+--+-
First the AROCC build started
Then RED RIDGE appeared in the antenna field
Then Liberty..... ,
Then NRO .... .
Then NGA .... .
Then USAF ... .
Let the party begin.
•
•
•
•
•
Who pays?
How do we design the layout?
Any more partners? Have we enough power?
Winter was approaching again - along with the risk.
Do we want temporary space on top of the toilets?
23 June 2010
SECRET
Then the other guests turned up
-+.-
~
~
~
~
~
~
~
_.....,....
__ ....._.
__ _. ___ .......,
__ .....,....
___ ._ __ ....._
__ ....__ -+.--+--+-
First the AROCC build started
Then RED RIDGE appeared in the antenna field
Then Liberty..... ,
Then NRO .... .
Then NGA .... .
Then USAF ... .
Let the party begin.
•
•
•
•
•
Who pays?
How do we design the layout?
Any more partners? Have we enough power?
Winter was approaching again - along with the risk.
Do we want temporary space on top of the toilets?
23 June 2010
SECRET
Another Survey is needed
-+-
--+---+--
.....
-- _....___ _...___ .___ ...._
__ _.__-+--
........
--+-
But the Bagram Hilton is overbooked that night ...
23 June 2010
SECRET
Another Survey is needed
-+-
--+---+--
.....
-- _....___ _...___ .___ ...._
__ _.__-+--
........
--+-
But the Bagram Hilton is overbooked that night ...
23 June 2010
SECRET
Progress was being made
-+-
--+---+--
....-- --t----+----._
__ _.___ _.__ -.....;...-- .........
--+-
We finally have our very own hole! !
23 June 2010
SECRET
Progress was being made
-+-
--+---+--
....-- --t----+----._
__ _.___ _.__ -.....;...-- .........
--+-
We finally have our very own hole! !
23 June 2010
SECRET
Quite Quickly by this point ...
-+-
--+---+--
.....
-- --+----+----
....--+--...--
-+--
........
--+-
Which soon started to look like something we could use
23 June 2010
SECRET
Quite Quickly by this point ...
-+-
--+---+--
.....
-- --+----+----
....--+--...--
-+--
........
--+-
Which soon started to look like something we could use
23 June 2010
SECRET
Finally the Build Begins
-+-
-.....;.---+---11--
_....,..__ .....____ ._ __ .....___ ...._._-+.--+--+-
Afghan technology is deployed to complete the ground works
23 June 2010
SECRET
Finally the Build Begins
-+-
-.....;.---+---11--
_....,..__ .....____ ._ __ .....___ ...._._-+.--+--+-
Afghan technology is deployed to complete the ground works
23 June 2010
SECRET
No Expense is Spared
-+-
--+---+--
.....
-- _....___ _...___ .___ ...._
__ _.__-+--
Only the best equipment is used
23 June 2010
SECRET
........
--+-
No Expense is Spared
-+-
--+---+--
.....
-- _....___ _...___ .___ ...._
__ _.__-+--
Only the best equipment is used
23 June 2010
SECRET
........
--+-
Meanwhile, back with ITServices
-+-
--+---+--
.....
-- --+----+----i---+--...--
-+--
........
--+-
We managed to get our hands on a plane!!
23 June 2010
SECRET
Meanwhile, back with ITServices
-+-
--+---+--
.....
-- --+----+----i---+--...--
-+--
........
--+-
We managed to get our hands on a plane!!
23 June 2010
SECRET
Somewhere is Sunny Afghanistan
-+-
--+---+--
.....
-- --+----+----
....--+--...--
-+--
........
--+-
Not quite the 46° that had been promised
23 June 2010
SECRET
Somewhere is Sunny Afghanistan
-+-
--+---+--
.....
-- --+----+----
....--+--...--
-+--
........
--+-
Not quite the 46° that had been promised
23 June 2010
SECRET
C& W were building the Dishes
-+-
--+---+--
.....
-- --+----+----i---+--...--
-+--
One man and his oower tools ©
23 June 2010
SECREt
........
--+-
C& W were building the Dishes
-+-
--+---+--
.....
-- --+----+----i---+--...--
-+--
One man and his oower tools ©
23 June 2010
SECREt
........
--+-
Whilst in a warm( er) data centre
-+-
--+---+--
.....
-- --+----+----i---+--...--
-+--
........
--+-
All those wires needed putting back in the right place
23 June 2010
SECRET
Whilst in a warm( er) data centre
-+-
--+---+--
.....
-- --+----+----i---+--...--
-+--
........
--+-
All those wires needed putting back in the right place
23 June 2010
SECRET
And finally it all came together
-+-
--+---+--
....-- --i----+----._
__ ...._
__ _.__-~--
........
--+-
A well earned photo opportunity for the team
23 June 2010
SECRET
And finally it all came together
-+-
--+---+--
....-- --i----+----._
__ ...._
__ _.__-~--
........
--+-
A well earned photo opportunity for the team
23 June 2010
SECRET
RT-RG Deploys
-+--+--+---.---+--+---~--+--+--+--+--+-
~
Same 5 rack solution that we started with 18
months earlier
~ 3/ 4 spoke sites configured at IOC
~ Final desktop issues resolved and so far the
deployment has been a big success.
23 June 2010
SECRET
RT-RG Deploys
-+--+--+---.---+--+---~--+--+--+--+--+-
~
Same 5 rack solution that we started with 18
months earlier
~ 3/ 4 spoke sites configured at IOC
~ Final desktop issues resolved and so far the
deployment has been a big success.
23 June 2010
SECRET
Area
82
today
.
.
.
.
-~
-
.
-....----.--
--.-
-
-.....--
--.---
.
.
-111--
--..-
.
---.--
.
-
~-
.
--.-
.
---..-
Very different frotn when we started 18 tnonths ago
23 June 2010
SECRET
.
-
Area
82
today
.
.
.
.
-~
-
.
-....----.--
--.-
-
-.....--
--.---
.
.
-111--
--..-
.
---.--
.
-
~-
.
--.-
.
---..-
Very different frotn when we started 18 tnonths ago