Documents
Internal TigerSwan Situation Report 2016-12-21
June 3, 2017
I TigerSWan
Salmons to Uncertainty?
DAPL SITREP 100
a
December 21, 2016
John Porter
ENERGY TRANSFE ChiefSecurity Officer
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE.
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS.
I TigerSWan
Salmons to Uncertainty?
DAPL SITREP 100
a
December 21, 2016
John Porter
ENERGY TRANSFE ChiefSecurity Officer
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE.
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS.
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND RECIPIENTS
The Highlights
continues to plot attacks against the pipeline in ND with the remaining
harder line protestors; it appears they are no longer considering peaceful prayer
demonstrations. Bold Iowa continues training sessions in IA as a group ofactivists from
Green Corps have joined the effort. Construction in IL is on schedule to be complete by
23DEC while SD has further reduced the size of the security team.
The Details
1. NORTH DAKOTA
A. Intel Update
TigerSwan
The ACLU and other organizations are requesting to use out-of?state attorneys who
are not members of the ND bar to assist with protester legal defense, as 264 people
still have no representation.
Reporting indicates is planning a complex attack on a valve site
within 30 miles ofthe camps that would involve ?lling the pipe with concrete while
the remaining protesters overwhelm HDD-?vlvr with waves of activists.
The protestors reportedly have a radio signal jammer device courtesy of
Anonymous.
Past 24 Hours
Hop-w updates: no workers on site today for Michel?s or Precision, IP Cameras
deployed, black picked up from Kupper Chevrolet this morning and taken
to Glenn?s welding sh op to have light kit installed, blue buggy taken to Moritz
Marine to get fixed.
HDD-E updates: small crew of 8-10 Michels workers on site for the next few days to
coat pipe/back ?ll and service/switch out light plants and generators.
Next 24 Hours
Maintain vigilance in anticipation of future demonstrations at North Bridge and
Turtle Hill.
Continue security efforts at HDD-W, HDD-E, valve sites and Man dan Municipal
Airport.
Morton County Sheriff?s Department, ND Highway Patrol, and ND DOT plan to
inspect North Bridge on 22DEC in preparation to open the road. Core samples will
take approximately 30 days to be analyzed.
Prepared for En ergy Transfer Partners
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND RECIPIENTS
The Highlights
continues to plot attacks against the pipeline in ND with the remaining
harder line protestors; it appears they are no longer considering peaceful prayer
demonstrations. Bold Iowa continues training sessions in IA as a group ofactivists from
Green Corps have joined the effort. Construction in IL is on schedule to be complete by
23DEC while SD has further reduced the size of the security team.
The Details
1. NORTH DAKOTA
A. Intel Update
TigerSwan
The ACLU and other organizations are requesting to use out-of?state attorneys who
are not members of the ND bar to assist with protester legal defense, as 264 people
still have no representation.
Reporting indicates is planning a complex attack on a valve site
within 30 miles ofthe camps that would involve ?lling the pipe with concrete while
the remaining protesters overwhelm HDD-?vlvr with waves of activists.
The protestors reportedly have a radio signal jammer device courtesy of
Anonymous.
Past 24 Hours
Hop-w updates: no workers on site today for Michel?s or Precision, IP Cameras
deployed, black picked up from Kupper Chevrolet this morning and taken
to Glenn?s welding sh op to have light kit installed, blue buggy taken to Moritz
Marine to get fixed.
HDD-E updates: small crew of 8-10 Michels workers on site for the next few days to
coat pipe/back ?ll and service/switch out light plants and generators.
Next 24 Hours
Maintain vigilance in anticipation of future demonstrations at North Bridge and
Turtle Hill.
Continue security efforts at HDD-W, HDD-E, valve sites and Man dan Municipal
Airport.
Morton County Sheriff?s Department, ND Highway Patrol, and ND DOT plan to
inspect North Bridge on 22DEC in preparation to open the road. Core samples will
take approximately 30 days to be analyzed.
Prepared for En ergy Transfer Partners
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND RECIPIENTS
2. IOWA
A. Intel Update
1} Approximater 8 people attended the Bold Iowa activist training in Grinnell on
ZUDEC. who are both professors at Grinnell College,
hosted the meeting. - as previouslvr been involved with Canvas People-
Power, an organization that helps people organize to start nonviolent revolutions.
2} Members from of the Green Corps also attended the Bold Iowa meeting in IGrinnell.
B. Past 24 Hours
1} Continued static secu ritvr at the I-35 pump station.
2} Travelled to Grinnell, IA to observe the Bold Iowa training session and then stopped
at the pump station to speak with guard force.
C. Next 24 Hours
1} Continue to perform static securityr the I-35 Pump station.
2} Travel to the Des Moines meeting site to observe the Bold Iowa training.
3. ILLINOIS
A. Intel Update
1} The Patoka Pipe ?fard continues to accumulate pipe as the retrograde of equipment
from the ROW continues. Current securityr is adequate for the short term. The
surveyr for a perimeter fence is complete.
2} Activist groups continue their attempt to exploit their 18DEC protest as a means to
garner support and funding. The Chicago-based groups continue to believe that
construction is not vet complete.
3} Local landowners and LE remain supportive and verv receptive to ETP operations
along the ROW in both Favette and Marion Counties.
4} Current threat assessment remains low.
5} Estimated completion of construction phase remains 23D EC.
B. Past 24 Hours
1} Construction crews continued cleanup of the Kaskaskia HDD site with the removal of
matting and heavvr equipment.
2} All valve sites ?tted with locks to inhibit access to those sites.
3} Conducted site visits and secu rityr analysis at the Patoka Pipe ?fard, Kaskaskia HDD
site and valve sites along the ROW.
C. Next 24 Hours
1} Meeting with ETP Construction management team.
4. SOUTH DAKOTA
TigerSwan Prepared for En ergvr Transfer Partners 2
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND RECIPIENTS
2. IOWA
A. Intel Update
1} Approximater 8 people attended the Bold Iowa activist training in Grinnell on
ZUDEC. who are both professors at Grinnell College,
hosted the meeting. - as previouslvr been involved with Canvas People-
Power, an organization that helps people organize to start nonviolent revolutions.
2} Members from of the Green Corps also attended the Bold Iowa meeting in IGrinnell.
B. Past 24 Hours
1} Continued static secu ritvr at the I-35 pump station.
2} Travelled to Grinnell, IA to observe the Bold Iowa training session and then stopped
at the pump station to speak with guard force.
C. Next 24 Hours
1} Continue to perform static securityr the I-35 Pump station.
2} Travel to the Des Moines meeting site to observe the Bold Iowa training.
3. ILLINOIS
A. Intel Update
1} The Patoka Pipe ?fard continues to accumulate pipe as the retrograde of equipment
from the ROW continues. Current securityr is adequate for the short term. The
surveyr for a perimeter fence is complete.
2} Activist groups continue their attempt to exploit their 18DEC protest as a means to
garner support and funding. The Chicago-based groups continue to believe that
construction is not vet complete.
3} Local landowners and LE remain supportive and verv receptive to ETP operations
along the ROW in both Favette and Marion Counties.
4} Current threat assessment remains low.
5} Estimated completion of construction phase remains 23D EC.
B. Past 24 Hours
1} Construction crews continued cleanup of the Kaskaskia HDD site with the removal of
matting and heavvr equipment.
2} All valve sites ?tted with locks to inhibit access to those sites.
3} Conducted site visits and secu rityr analysis at the Patoka Pipe ?fard, Kaskaskia HDD
site and valve sites along the ROW.
C. Next 24 Hours
1} Meeting with ETP Construction management team.
4. SOUTH DAKOTA
TigerSwan Prepared for En ergvr Transfer Partners 2
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
A. Intel Update
1} No significant intel to report.
B. Past 24 Hours
1} Secu l?It'y' team reduced to 9 personnel.
2} Secu l?It'y' continued static security:r at the pump station and escort of electricians.
C. Next 24 Hours
1} Continu static securityr at the pump station and escort of electricians.
TigerSwan Prepared for En erg?yr Transfer Partners
INFORMATION CONTAINED IN THIS REPORT IS PROPRIETARY AND SENSITIVE
DO NOT RELEASE OUTSIDE OF AUTHORIZED AND APPROVED RECIPIENTS
A. Intel Update
1} No significant intel to report.
B. Past 24 Hours
1} Secu l?It'y' team reduced to 9 personnel.
2} Secu l?It'y' continued static security:r at the pump station and escort of electricians.
C. Next 24 Hours
1} Continu static securityr at the pump station and escort of electricians.
TigerSwan Prepared for En erg?yr Transfer Partners