Medusa weekly status report
Oct. 23, 2016
new" n-m
Name Dvarill Frujazt u.
wines: and: unansn um: um 1
Wm?" Manigtr
Owner
mm Sta
Dlnendinks
FGA
Exacutivl Summiry of mm" m.
mlEfl mneimnns and Imus is amund the "'51 win. FGA hy on this year this is a way hall! Intel mi. nafluflt amund the sin :11 um
. (as My: slipnsd and we sis FGA undamd an m: min-gm mien meeungs and mm been uplmm in terms mm: man using a real men with In
add' 9.
a (as mm Comments nn nu: Amhlr or sii ad
in, mus "Eu? For-cast mum. sums din" as
Card D2 way 24--May ounn 1m
FGA PWIYDE 15-st 24-Oct any.
214m 27-Oct
EE 0.2 a Flaw sale Law sandman. 31--0.:
EE 0 Pedarmalm: Update/Enznded 2am M-Feh
EE 1.n a an amp.- 09-Mflr
mild ind ichiavad inivity during last pa nu
A2 {ants have hzefil zump'aed hy snunsman and will DE ns IIle an wm 15m nmares aim-mm: hme has hzefil in m: hardwam "Indium Ran mnenisinims A2 cards can and mum. areas arE an cm and
a Dlan w: nm a de'fly Di 3 weeks m: Slag: 1 animus dams. dam; will h: named with FGA an the saw an 012 lam-Aug
mild but um idliavad iniuty (in us list periud
la: 1 filmwam (nml an] vildatmn has innis minutes than Iannsd winsn has had a an diam an m: s: 2 1 fimlwal:
"as inner! ind admired
opus-d Agrlad Inquest;
mild in. nan Ilriud
MD and test an the A2 (am an 1501 Sdledul: men with man an 224mg om Med mam an fimlwal: Stage 1
ssussinn i-n Ills
Mitigation Owner
am mom [men n: A1 mm mama Ia
auxeman Ami. with Dan Mine-mi sysum \ssuas mm wuisnns .n
was:
runniinl
mam Mlhgillng Amnns Mmgillon Owner
R-nm unsung marine <>: w: need an .nsns 1min was
Pnss'bie benign Ihe
ing'naeflng min ims so the
mini \imhne and
are nun-w Ia Ansm! um! um
have an! mam min; an the
mu Ans"! a issnson man
new" n-m
Name Dvarill Frujazt u.
wines: and: unansn um: um 1
Wm?" Manigtr
Owner
mm Sta
Dlnendinks
FGA
Exacutivl Summiry of mm" m.
mlEfl mneimnns and Imus is amund the "'51 win. FGA hy on this year this is a way hall! Intel mi. nafluflt amund the sin :11 um
. (as My: slipnsd and we sis FGA undamd an m: min-gm mien meeungs and mm been uplmm in terms mm: man using a real men with In
add' 9.
a (as mm Comments nn nu: Amhlr or sii ad
in, mus "Eu? For-cast mum. sums din" as
Card D2 way 24--May ounn 1m
FGA PWIYDE 15-st 24-Oct any.
214m 27-Oct
EE 0.2 a Flaw sale Law sandman. 31--0.:
EE 0 Pedarmalm: Update/Enznded 2am M-Feh
EE 1.n a an amp.- 09-Mflr
mild ind ichiavad inivity during last pa nu
A2 {ants have hzefil zump'aed hy snunsman and will DE ns IIle an wm 15m nmares aim-mm: hme has hzefil in m: hardwam "Indium Ran mnenisinims A2 cards can and mum. areas arE an cm and
a Dlan w: nm a de'fly Di 3 weeks m: Slag: 1 animus dams. dam; will h: named with FGA an the saw an 012 lam-Aug
mild but um idliavad iniuty (in us list periud
la: 1 filmwam (nml an] vildatmn has innis minutes than Iannsd winsn has had a an diam an m: s: 2 1 fimlwal:
"as inner! ind admired
opus-d Agrlad Inquest;
mild in. nan Ilriud
MD and test an the A2 (am an 1501 Sdledul: men with man an 224mg om Med mam an fimlwal: Stage 1
ssussinn i-n Ills
Mitigation Owner
am mom [men n: A1 mm mama Ia
auxeman Ami. with Dan Mine-mi sysum \ssuas mm wuisnns .n
was:
runniinl
mam Mlhgillng Amnns Mmgillon Owner
R-nm unsung marine <>: w: need an .nsns 1min was
Pnss'bie benign Ihe
ing'naeflng min ims so the
mini \imhne and
are nun-w Ia Ansm! um! um
have an! mam min; an the
mu Ans"! a issnson man
Report Date
Project Name
Endace Probe
Overall Project Health
date
Previous Status
Project Code:
Project Manager:
Sponsor:
Owner:
Technical owner
Project Stage:
Execution
Financial Red
Financial
-1 week
Red
-2 weeks
Amber
Schedule
-3 weeks
Green
Project Scope Summary
Typicaly a high level extraction of the PRD
Dependencies
Micro- OSM
Dependants
??
Financial Status
What does Endace require & what information is available
Executive Summary of Overall Project Status
Project is underway with a risk of not being able to deliver all functionality in the current targeted time frame
Milestone Summary
Delivery Dates
%
Original Revised Forecast Complet
e
Date
Date
Date
Key Milestones
Planned
Planned
Planned
if
changed
if
changed
if
changed
PM
forecast
PM
forecast
PM
forecast
RAG
Status
Comments on Red / Amber Status or
slipped deliveries
Complete
Green
Amber
Planned
Planned
Planned
Planned
if
PM
Complete
changed
forecast
if
PM
Amber
changed
forecast
if
PM
Red
changed
forecast
if
PM
Complete
changed forecast
Racking locations have been finalised & cabling is either completed or underway
New networking equipment has been identified & ordered - eta 3 weeks - will need to work around this
Not Planned and acheved
Assumptions
Proposed & Agreed Change Requests
Planned for next period
Build of the Unity product is now to be delivered on physical servers (not on virtual
Critical Issues
Issue #
Issue
Owner
Issue
I-001
I-002
I-003
Urgency
Impact
Issue
Rating
Immediat Moderate
e
Immediat Moderate
e
ShowImmediat
stopper
e
Low
Medium
High
Likelihoo Potentia
d
l Impact
Risk
Rating
Actions
Mitigatio
n Owner
Name of
Engineer
Line
manager
Name of
Engineer
Critical Risks
Risk #
Risk
Risk
Owner
Urgency
R-001
Immediate Highly
Likely
Critical
R-002
When
Possible
Immediate
Probable
Low
Probable
Showstopper
Critical
ASAP
Probable
Critical
Medium
Medium
R-003
R-004
High
Mitigating Actions
Mitigatio
n Owner
Name of
product
owner
Name of
Engineer
Stakeholde
rLine
manager
Report Date
Project Name
Endace Probe
Overall Project Health
date
Previous Status
Project Code:
Project Manager:
Sponsor:
Owner:
Technical owner
Project Stage:
Execution
Financial Red
Financial
-1 week
Red
-2 weeks
Amber
Schedule
-3 weeks
Green
Project Scope Summary
Typicaly a high level extraction of the PRD
Dependencies
Micro- OSM
Dependants
??
Financial Status
What does Endace require & what information is available
Executive Summary of Overall Project Status
Project is underway with a risk of not being able to deliver all functionality in the current targeted time frame
Milestone Summary
Delivery Dates
%
Original Revised Forecast Complet
e
Date
Date
Date
Key Milestones
Planned
Planned
Planned
if
changed
if
changed
if
changed
PM
forecast
PM
forecast
PM
forecast
RAG
Status
Comments on Red / Amber Status or
slipped deliveries
Complete
Green
Amber
Planned
Planned
Planned
Planned
if
PM
Complete
changed
forecast
if
PM
Amber
changed
forecast
if
PM
Red
changed
forecast
if
PM
Complete
changed forecast
Racking locations have been finalised & cabling is either completed or underway
New networking equipment has been identified & ordered - eta 3 weeks - will need to work around this
Not Planned and acheved
Assumptions
Proposed & Agreed Change Requests
Planned for next period
Build of the Unity product is now to be delivered on physical servers (not on virtual
Critical Issues
Issue #
Issue
Owner
Issue
I-001
I-002
I-003
Urgency
Impact
Issue
Rating
Immediat Moderate
e
Immediat Moderate
e
ShowImmediat
stopper
e
Low
Medium
High
Likelihoo Potentia
d
l Impact
Risk
Rating
Actions
Mitigatio
n Owner
Name of
Engineer
Line
manager
Name of
Engineer
Critical Risks
Risk #
Risk
Risk
Owner
Urgency
R-001
Immediate Highly
Likely
Critical
R-002
When
Possible
Immediate
Probable
Low
Probable
Showstopper
Critical
ASAP
Probable
Critical
Medium
Medium
R-003
R-004
High
Mitigating Actions
Mitigatio
n Owner
Name of
product
owner
Name of
Engineer
Stakeholde
rLine
manager
Summary traffic light
Financial Green
Financial Amber
Financial Red
Schedule Green
Schedule Amber
Schedule Red
Risk Green
Risk Amber
Risk Red
Summary traffic light
Financial Green
Financial Amber
Financial Red
Schedule Green
Schedule Amber
Schedule Red
Risk Green
Risk Amber
Risk Red